Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 10, 2025 at 8:00 PM
Updated July 11, 2025
Renovation of a fitness / recreation center in Storrs Mansfield, Connecticut. Completed plans call for the renovation of a fitness / recreation center.
University's Storrs Campus and is soliciting re-bids in the categories of structural steel, misc. metals, spray insulation, firestopping, visual displays, wall protection & shelving, signage, high-density shelving and conveying equipment as indicated in the 100% construction documents prepared by Newman Architects. REQUEST FOR INFORMATION: No questions will be accepted after 5:00 PM June 24th, 2025. Please send all RFI's to estimating@doc.build. Job Description: Project Intent is to bring athletics, research, clinical operations as well as entrepreneurial academics together in one building that can build upon each other. A more integrated approach to campus life, with an emphasis on recreation, athletic activity, human performance and applied health science. Renovate existing team, coaches, visitor locker rooms for the teams remaining within the fieldhouse to a standard established in the new locker rooms with the Rizza performance center. Scope of Work includes: Renovation of approximately 80,000 GSF of the existing fieldhouse that will meet the University Design Standards and Performance Guidelines. o Renovation includes but is not limited to locker rooms including toilets and showers, strength and conditioning room, exercise, rowing tank room, equipment and receiving, academic center office, tutorial, conference space, open study spaces, classroom, kitchen, ergonomic room, sports medicine, exterior access toilet rooms, MEP support space, National C Club office space and general office and conference rooms. o Renovation will include infrastructure upgrades including but not limited to, HVAC, mechanical, electrical, telcom, IT, AV, security, fire alarm, fire protection, plumbing, site utilities, roof and envelop repairs/upgrade. o Renovation includes abatement of Asbestos Containing Materials (ACM) and may include presumed PCB containing materials. o New Exterior entry vestibule and site/landscape improvements. o The building is targeting LEED V4 certified certification and will conform to Connecticut High Performance Building requirements. o Phase 2 has begun with substantial completion no later than December 30, 2026 The Set-Aside Requirement for a bid package designated as 100% SBE and 10% MBE is that (1) one hundred percent (100%) of the Total Contract Price be awarded to a subcontractor who is certified by the Connecticut Department of Administrative Services as Small Business Enterprises (SBEs) and (2) not less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as Minority Business Enterprises (MBEs). The 10% set aside for MBEs may be included in the 100% set aside for SBEs. The Set-Aside Requirement for a bid package designated as 100% SBE and 100% MBE is that (1) one hundred percent (100%) of the Total Contract Price be awarded to a subcontractor who is certified by the Connecticut Department of Administrative Services as Minority Business Enterprises (MBEs). The 100% set aside for MBEs is included in the 100% set aside for SBEs
Post-Bid
Fitness / Rec Centers
$133,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2025
August 8, 2025
2111 Hillside Rd, Storrs Mansfield, CT
Related To This Project
Storrs Mansfield, CT
Bid Date: Feb 13 2025
Storrs Mansfield, CT
Bid Date: Jan 28 2025
Storrs Mansfield, CT
Bid Date: Apr 23 2025
Storrs Mansfield, CT
Bid Date: Feb 26 2025
Storrs Mansfield, CT
Bid Date: Apr 22 2025
Storrs Mansfield, CT
Bid Date: Mar 13 2025
Storrs Mansfield, CT
Bid Date: Mar 25 2025
Storrs Mansfield, CT
Bid Date: Apr 08 2025
Storrs Mansfield, CT
--
Storrs Mansfield, CT
Bid Date: Jan 30 2025
Storrs Mansfield, CT
Bid Date: Jan 16 2025
Storrs Mansfield, CT
Bid Date: Apr 03 2025
Storrs Mansfield, CT
Bid Date: Feb 13 2025
Storrs Mansfield, CT
Bid Date: Sep 04 2025
Storrs Mansfield, CT
Bid Date: Dec 06 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
