BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Marshall, Arkansas. Completed plans call for the renovation of a 9,864-square-foot educational facility.

The Searcy County School District is seeking sealed bids for two projects. Install RetroFit Metal Roof: 3" EPS Insulation to fill flutes Mechancially fasten a 900-psi rated cover board Mechanically fasten 60-mil Duror Last Membrane over top of cover board Install New Gutters and Down Spouts Install Dura-Ribs to maintain continuity Total Roof area 71,113 square feet Roof consist of an 11,221 Cap: Included on diagram below Main Building Roof Square Foot of 59,892 which includes overhangs 1. Replacement of the roofing system at the Marshall High School Lower Gym. Proposal Bidwill be for an estimated 9,864 sqft of Duralast/TPO with tapered insulation. 2. Replacement of the roofing system at Leslie Intermediate School. Proposal will be for duralast/TPO with tapered insulation. Included in bid must be: 5% bid bond, proof of ability to provide Performance Bond for full cost of project, Ark. Contractor's License Number, References, Statement of Assurance to adhere to all standards and requirements of theArkansas School Facility Manual. For questions, please call Tim Baysinger at PH: 870-447-6111 ext. 5201

Post-Bid

Educational

$70,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
10
Bidding Soon
117
All Active Projects
54
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2025

February 3, 2025

img_map_placeholder

950 US-65, Marshall, AR

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.