BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2026 at 7:00 PM

Updated February 4, 2026

Site work and paving for a bridge / tunnel in South Windsor, Connecticut. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of February 3, 2026, this project is in the 2025-2029 ConnDOT Transportation Transportation Infrastructure Capital Plan. A design firm has been selected. An advertisement for bids is expected to be issued in late February. Construction is expected to begin in July of 2026 and last through late 2027. The Bissell Bridge carries I-291 over the Connecticut River in South Windsor and Windsor and is situated between Windsor Meadows State Park on the west and James’s State Trail on the east; approximately one mile east of the I-91 Junction. This project includes but is not limited to the following work: • Replace wearing surface and membrane waterproofing • Repair areas of concrete deck as needed • Repair concrete parapets, median barrier, and curbs • Repair fence and bridge railing • Full replacement of bridge joints • Remove the abandoned movable inspection platform • Repair areas of deteriorated structural steel • Strengthen steel girders as required to meet permit vehicles load rating requirements • Clean and paint the steel girders, beam ends, fixed bearings, and end diaphragms • Remove the vegetation along the fascia girder • Repair and patch deteriorated substructure elements (above water) Description - Rehab Br 01431 (Bissell) O/ Ct River - - AC CONVERSION Location : Windsor/south Windsor Route : I-291 As of April 21, 2025 the project is in Conceptual status. Anticipated year 2026 CTDOT - Bridge Rehabilitation - I-291 *project Information Has Been Obtained Through a Public State Transportation Improvement Plan (Stip). A Stip is a Financial Schedule for Short- and Long-range Projects Which is Updated Regularly. Information Listed in the Stip Often Evolves Based on Funding Availability. The Project Details, Including Timeline and Value, Are Subject to Change. The Content Management Team Will Continue to Pursue Additional Details as They Become Available.

Design

Bridges / Tunnels

$200,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
997
Active Projects
509
Bidding Soon
5,809
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2026

Project location map

I-291, South Windsor, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.