Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 16, 2025 at 8:00 PM
Updated April 17, 2025
Site work for a civil project in Farmington, New Mexico. Conceptual plans call for site work for a water / sewer project.
These improvements will consist of the construction of a detention pond on a 7.5 acre vacant property at Hood Arroyo, north of Crestwood Drive. The vacant property was acquired by the City of Farmington in January 2015. Floyd Hinesley plans to develop the land to the north and east of the existing Crestwood Estates Subdivision. Mr. Hinesley has agreed to contribute funds for the construction of the Culpepper Detention Pond. A contribution of $3,850 per lot, at the time of closing, is expected. Assuming 78 lots are created, a total of $300,300 is likely to be contributed to the pond construction at buildout. This construction will address storm drainage improvements near Crestwood Drive for capture and control of storm water that has historically resulted in major flooding and overtopping of roadways at Crestwood Drive, Hill-N-Dale Drive, Piñon Hills Boulevard, Hubbard Road, and Rail Road. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of April 16, 2025, per owner, this will be a developer driven project. There is no funding appropriated for this project at present. The land is already acquired. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$1,931,600.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2026
Crestwood Dr, Farmington, NM
Related To This Project
Farmington, NM
--
Farmington, NM
--
Farmington, NM
--
Farmington, NM
--
Farmington, NM
--
Farmington, NM
--
Farmington, NM
--
Farmington, NM
--
Farmington, NM
Bid Date: Jan 10 2025
Farmington, NM
Bid Date: Jan 21 2025
Farmington, NM
Bid Date: Jan 28 2025
Farmington, NM
Bid Date: Jan 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
