Site work and paving for a mixed-use development in Shillington, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of March 11, 2025 the project has not been awarded yet. The timeline for award has not yet been established.** The Work to be performed for this Project includes furnishing all labor, materials, equipment and appurtenances for full depth reconstruction for Holland Street, Gregg Street,Meade Terrace and Woodland Avenue. ADA curb ramp and curb construction are also included in the project. Alternative bid for full width mill and overlay for a section of Butch Bare Lane and Parking Lot for Pavilion No. 3, located in Shillington Memorial Park. IF YOU HAVE ANY QUESTIONS REGARDING THESE CONTRACT DOCUMENTS, PLEASE CONTACT: JOSEPH P. ROGOSKY, P.E. GREAT VALLEY CONSULTANTS 75 COMMERCE DRIVE WYOMISSING, PA 19610-3323 (610) 375-8822 Proposal for the 2025 Street Improvements Project shall be accompanied by a Proposal Security in the amount of ten percent (10%) of the total amount of the Proposal. All Proposals shall be effective for sixty (60) days. The work to be performed must be completed within one hundred twenty (120) days of the Notice to Proceed. The successful bidder will be required to furnish a Performance Bond,Payment Bond and Maintenance Bond Certificate of Insurance and Workmen's Compensation Act Affidavit in a sum not less than 100% of the total contract amount, said bond to be that of an approved surety company authorized to transact business in the Commonwealth of Pennsylvania. Notice is given that the Project for which construction bids are being solicited here-by is a project constituting public works and is subject to applicable provisions of the Pennsylvania Prevailing Wage Act, Act of August 15, 1961,P.L. 987, as amended and supplemented, and appropriate prevailing minimum rates as promulgated under provisions of said act must be paid by contractors in connection with performance of the necessary Work. Proposed Bidders shall be PennDOT Prequalified per PennDOT Specifications(PennDOT Publication 408 lat-est revision, Section 102.01).Subcontractors shall be PennDOT prequalified except subcontractors performing ADA curb ramp and curb construction. Borough of Shillington reserves the right, which is understood and agreed to by all Bidders, to reject any and all Bids, and to accept any Bid which is deemed most favorable to the Borough, at the time and under the circumstances stipulated. The Borough also reserves its right at its sole discretion, to waive any informality in the Bid, and to waive any omissions, errors, mistakes, defects or irregularities in any Bid. All bids shall be presented or the proposal form provided and shall be sealed, marked and addressed as follows:Borough of Shillington2 East Lancaster Avenue Shillington, PA 19607Attention: Scott D. Brossman, Borough Manager"Proposal for 2025 Street Improvements Project"

Bid Results

Roads / Highways

$1,073,365.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

20

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Structures
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
315
Active Projects
160
Bidding Soon
2,456
All Active Projects
1,138
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

March 10, 2025

img_map_placeholder

Multiple Locations, Shillington, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Street Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.