BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 14, 2025

Site work and paving for a bridge / tunnel in West Bethlehem, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Scope of This Job is to Install Latex-concrete Overlays After Performing Hydro-demolition, as Well as Other Various Repairs Including Approach Slabs, Concrete Repairs, and Other Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package. Work Will Be Conducted at Six Locations Listed Below to Extend the Life of the Structures. Locations: a) State Route 119, Section 17m, in Westmoreland County, New Stanton Borough From Approx. Segment 0150 Offset 1145 to Approx. Segment 0160 Offset 2127 B) State Route 119, Section 18m, in Westmoreland County, New Stanton Borough From Approx. Segment 0161 Offset 0146 to Approx. Segment 0161 Offset 2369 C) State Route 217, Section 01m, in Westmoreland County, Derry Township From Approx. Segment 0180 Offset 0860 to Approx. Segment 0180 Offset 1452 D) State Route 993, Section 05m, in Westmoreland County, Irwin Borough From Approx. Segment 0100 Offset 1478 to Approx. Segment 0100 Offset 2572 E) State Route 2020, Section 07m, in Washington County, West Bethlehem Township From Approx. Segment 0220 Offset 2114 to Approx. Segment 0220 Offset 2588 F) State Route 4051, Section 01m, in Washington County, South Strabane Township From Approx. Segment 0020 Offset 1810 to Approx. Segment 0020 Offset 2360 Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 69.00% Pre-bid Meeting: None Anticipated Ntp: 04/28/2025 Wage Rates: Yes Required Completion: 12/31/2026 Prequalification Requirement: Yes State Type of Work: Deck Rehabilitation Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PA DOT - 2025 D12 Hyro/Latex Bridge Deck Pres *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$5,000,000.00

Public - State/Provincial

Paving, Site Work

98

12

8

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
114
Bidding Soon
1,303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 28, 2025

Project location map

Multiple Locations, West Bethlehem, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.