BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2025 at 8:00 PM

Updated May 2, 2025

Site work for a water / sewer project in Bayfield, Colorado. Working plans call for site work for a water / sewer project.

**As of April 30, 2025, bids received were rejected. Project will be rebid but no definite date yet.** The WORK will consist of removing approximately 1,555-feet of 10" gravity sewer main and installing new 15" gravity sewer main with associated pre-cast man-holes. The Work will include the removal of the existing 10" gravity sewer main within the existing 30" Steel Casing that spans over Wilson Gulch for approximately 100-feet and re-installing new 15" gravity sewer main with new pipe spacers. The WORK will include approx-imately 17 utility crossings. The WORK will include deep trenching as well as work within City of Durango roadways of High Llama Lane and Wilson Gulch Drive. Traffic control and erosion and sediment control are intended to be provided by the successful bidder as part of the project Question Deadline 03/07/2025 All questions about the meaning or intent of the Contract Documents are to be directed to South Durango Sanitation District P.O. Box 2024 Durango, Co. 81302 (970) 238-6438 Attn: Andrew Aragon Email: andrew@southdurangosanitation.org A bid security in the form of a Bid Bond, Cashier's Check, or Certified Check in the amount of 5% of the bid amount must accompany each Bid. Performance & Payment Bonds: The successful Bidder will be required to furnish a Construction Performance Bond and a Construction Payment Bond each in the amount of 100% of the contract price as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards to the lowest responsive, responsible bidder as it may best serve the interest of the Owner

Final Planning

Water / Sewer

$300,000.00

Public - City

Site Work

16

11

2

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
1
Bidding Soon
90
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

October 30, 2025

Project location map

Multiple Locations, Bayfield, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.