Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 20, 2025 at 8:00 PM
Updated March 21, 2025
Site work and paving for a road / highway in Skippack, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Skippack Township Board of Supervisors will receive sealed bids for its 2025 Skippack Township Road Improvements Project. The work along roadways willinclude: Hesier Rd - Mobilization, Traffic Control, CoreSample, 1-1/2" Milling (4,165sy), 5" Base Repair (600 sy),Leveling Course (70 tons),1-1/2" Wearing Course (4,165sy), Remove & Replace M Inlet Top; Center Ave - Mobilization, Traffic Control, CoreSample, 1-1/2" Milling (2,640sy), 5" Base Repair (700 sy),Leveling Course (45 tons),1-1/2" Wearing Course 9.5mm(2,640 sy): Thompson Rd -Mobilization, Traffic Control,Core Sample, 1-1/2" Milling(4,030 sy), 5" Base Repair(2,000 sy), Leveling Course (60tons), 1-1/2" Wearing Course9.5mm (4,030 sy), Reset MInlet Top to Grade; Ivy Ln -Mobilization, Traffic Control,Core Samples, 1-1/2" Milling(1,620 sy), 5" Base Repair (400sy), Leveling Course (40 tons),1-1/2" Wearing Course 9.5mm(1,620 sq); Detwiler Rd - Mobilization, Traffic Control, CoreSamples, 1-1/2" Milling(3,160sy), 5" Base Repair (700sy),Leveling Course (60 tons),1-1/2" Wearing Course 9.5mm(3,160), Remove & Replace MInlet Top (5 ea); Mountain TopDr - Mobilization, Traffic Control, Core Samples, 1-1/2" Milling (10,160sy), 5" Base Repair(1,500 sy), Leveling Course(160 tons), 1-1/2" WearingCourse 9.5mm (10,160 sy), Remove & Replace ADA Ramp (5ea), Remove & Replace Concrete Curb (100 lf),Remove& Replace Trail at ADA Ramp(40 sy); Mountain Laurel Cir -Mobilization, Traffic Control,Core Samples, 1-1/2" Milling (2,710 sy), 5" Base Repair(100 sy), Leveling Course (40tons), 1-1/2" Wearing Course9.5mm (2,710 sy), Remove &Replace ADA Ramp, Remove& Replace Concrete Curb (20lf), Remove & Replace M InletTop; Mesa Ln - Mobilization,Traffic Control, Core Samples,1-1/2" Milling (9,225 sy), 5"Base Repair (500 sy), Leveling Course (200 tons), 1-1/2"Wearing Course 9.5mm (9,225sy), Remove & Replace ADARamps (2 ea), Remove & Replace Concrete Curb (40 lf),Remove & Replace M InletTop (2 ea),; Buck Hollow Rd -Mobilization, Traffic Control,Core Samples, 1-1/2" Milling(2,025 sy), 5" Base Repair (200sy), Leveling Course (40 tons),1-1/2" Wearing Course 9.5mm(2,025 sy), Remove & ReplaceADA Ramps (2 ea), Remove& Replace Concrete Curb (40lf), Install New ADA Ramp &Curb; Township Line Road -Mobilization, Traffic Control,Core Samples, 1-1/2" Milling(7,050 sy), 5" Base Repair (300sy), Leveling Course (60 tons),1-1/2" Wearing Course 9.5mm(7,050 sy), Reset M Inlet Top toGrade (2ea); Perkiomen CreekRoad - Mobilization, TrafficControl, Core Samples, 1-1/2"Milling(10,595 sy), 5" Base Repair (300 sy), Leveling Course( 180 tons), 1-1/2" WearingCourse 9.5mm (10,595 sy). Bids shall be submitted in a sealed envelope and shall be marked clearly as follows: Sealed Bid - Proposal for 2025Skippack Township Road Improvements Project. Requirements for a 10% Bid Bond,100% Performance Bond, and100% Payment Bond are included in the contract documents. Prevailing state wage ratesand Public Works Employment Verification Act will apply on this project. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Instruction to Bidders. TheTownship of Skippack Township reserves the right toreject any or all bids, and to make such award as appearsmost advantageous to theTownship.
Post-Bid
Roads / Highways
$400,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2025
April 3, 2025
Multiple Locations, Skippack, PA
Related To This Project
Skippack, PA
Bid Date: Jun 06 2025
Skippack, PA
Bid Date: Dec 09 2025
Skippack, PA
Bid Date: Feb 06 2026
Skippack, PA
Bid Date: Mar 04 2025
Skippack, PA
Bid Date: Dec 10 2024
Skippack, PA
Bid Date: Sep 11 2024
Skippack, PA
Bid Date: Sep 12 2024
Skippack, PA
Bid Date: Apr 09 2024
Skippack, PA
Bid Date: Apr 09 2024
Skippack, PA
Bid Date: May 09 2024
Skippack, PA
Bid Date: Aug 10 2020
Skippack, PA
Bid Date: Nov 15 2023
Skippack, PA
Bid Date: Apr 20 2023
Skippack, PA
Bid Date: Apr 11 2023
Skippack, PA
Bid Date: Apr 13 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
