Renovation of a laboratory facility in Batavia, Illinois. Completed plans call for the renovation of a laboratory facility.
This statement of work (SOW) aims to obtain supervision, expertise, labor, materials, and equipment for the work indicated below. The work will be completed at Proton West 7 (PW7) at the Fermilab facility in Batavia, Illinois. Fermilab is operated by the Fermi Forward Discovery Group (FFDG). FFDG will provide a Task Manager / Construction Coordinator (TM/CC) to oversee the project. The subcontractor will replace the existing water-cooled HVAC unit at PW7. The subcontractor will purchase and provide the replacement unit. This is an end-of-life replacement of the HVAC system. The subcontractor will be responsible for all installation, labor, supervision, equipment, measurements, programming, and testing needed to complete this project before turning it over to FFDG. SCOPE OF WORK Subcontractor shall perform the following: Mobilize to PW7 FIMS 626 The contractor will remove the existing York E#1922 water-cooled cooling-only unit. LOTO (lock out tag out) electrical panel PHP-WB-2-1 Circ.7-9-11. Isolate 2" water lines. Remove existing electrical wiring. Ensure line voltage and control wiring are removed and disposed of as required. Disconnect both supply and return water lines. Disconnect condensate line. Once the unit is completely disconnected, TM/CC will work with an in-house overhead crane technician to assist with the removal. The contractor will provide and install a new 20-ton water-cooled system as indicated below. TM/CC will install a new unit with an in-house overhead crane technician. The contractor will provide vibration pads for the new unit to sit on. The contractor will provide a new 2" Penn refrigeration regulator valve. The contractor will install a 2" Penn valve with a 1/4-inch refrigeration line from the high side of the regulator valve. The contractor will install a refrigeration tee for service and pressure testing. The contractor is to supply all 2" copper and materials necessary to connect the supply and return water lines properly. The contractor will supply and install new insulation on water lines after the leak is checked. The contractor will install a new electrical 460VAC-3 phased, fused disconnect. The contractor must supply appropriately sized fuses to match unit MOCP. The contractor must supply an appropriately sized wire and conduit for the new unit. The contractor will make the final connections and check the phasing. The contractor is to install an FFDG-supplied thermostat. The contractor will install a new 8-wire thermostat wire from the unit to the thermostat. The contractor is to land low-voltage wiring. The contractor must supply proper duct supplies (e.g., a Pair of pants) for adequate amperage and airflow. The TM/CC will provide an in-house overhead crane technician to lift ductwork for final installation. The contractor is to start up the equipment. Provide an amp draw on motors to ensure proper ducting. Adjust the Pen valve to the proper height to ensure an appropriate flow and pressure. The contractor is to fill out manufacturer start-up paperwork. Demobilize, final clean up, and check. The contractor must provide TM/CC with all manuals and a picture of the manufacturer's nameplate PRE-PROPOSAL MEETING/SITE VISIT A Pre-Proposal Meeting and Site Visit is scheduled for 10.30 A.M. Central Time, Wednesday March 05, 2025 at Wilson Hall Ground Floor West Lobby
Post-Bid
Laboratories
$250,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2025
June 9, 2025
To Be Determined, Batavia, IL
Related To This Project
Batavia, IL
Bid Date: Mar 11 2025
Batavia, IL
Bid Date: Mar 14 2025
Batavia, IL
Bid Date: Apr 18 2025
Batavia, IL
--
Batavia, IL
Bid Date: Apr 16 2025
Batavia, IL
Bid Date: Jun 27 2025
Batavia, IL
Bid Date: Apr 16 2025
Batavia, IL
Bid Date: Apr 10 2025
Batavia, IL
--
Batavia, IL
Bid Date: Mar 21 2025
Batavia, IL
Bid Date: Feb 13 2025
Batavia, IL
Bid Date: Dec 10 2025
Batavia, IL
Bid Date: Feb 05 2025
Batavia, IL
Bid Date: Jan 24 2025
Batavia, IL
Bid Date: Jan 08 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.