Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 7, 2025 at 7:00 PM
Updated October 1, 2024
Renovation of a military facility in West Bend, Wisconsin. Completed plans call for the renovation of a 21,500-square-foot military facility.
Base Bid will be received for: A single lump sum bid for All Work. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of: Removing approximately 21,500 square feet of aggregate-surfaced, built up roofing on the readiness center low-slope roof areas. Existing coverboards and insulation shall also be removed to expose the existing roof deck. Portions of the existing composite fiber structural panel roof decking will be load tested to confirm prolonged exposure to moisture has not affected its load carrying capacity. The new roofing will consist of mechanically fastened insulation (R-25 average) with a fully adhered EPDM membrane. Provide new gutters, downspouts, flashings and roof equipment curbs as indicated in the drawings. Estimate construction cost : $661,500 Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. ** bid date info : Sealed bids will be received as follows, before the time indicated above: PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) submitted via online l (this is the preferred method) ** online bid open info : https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_NmIxOWU2MzEtODJkNi00ZDFiLThiOTYtYTZiMjM0MzNjZDU5%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522f4e2d11c-fae4-453b-b6c0-2964663779aa%2522%252c%2522Oid%2522%253a%252216987bcd-db9d-4075-aa58-5b60d229f4e3%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=e555632c-2808-4aaf-b833-1b16b749f6f2&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true
Bid Results
Military
$553,122.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
14
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 06 - Wood, Plastics, and Composites
Division 08 - Openings
Division 11 - Equipment
Division 14 - Conveying Equipment
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2025
March 27, 2025

To Be Determined, West Bend, WI
Related To This Project
West Bend, WI
Bid Date: Mar 24 2025
West Bend, WI
--
West Bend, WI
Bid Date: Mar 17 2025
West Bend, WI
Bid Date: Mar 31 2025
West Bend, WI
Bid Date: Mar 19 2025
West Bend, WI
Bid Date: Apr 04 2025
West Bend, WI
Bid Date: Apr 04 2025
West Bend, WI
Bid Date: Apr 16 2025
West Bend, WI
Bid Date: Feb 28 2025
West Bend, WI
Bid Date: Feb 28 2025
West Bend, WI
--
West Bend, WI
Bid Date: Feb 17 2025
West Bend, WI
Bid Date: Mar 06 2025
West Bend, WI
Bid Date: Feb 13 2025
West Bend, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.