BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Renovation of a playground / park / athletic field in Greenwood, Minnesota. Working plans call for the renovation of a playground / park / athletic field.

As of March 28, 2025, project is on hold. No definite date for the rebid. The work includes the construction of approximately: 205 1 145 266 1 1 205 CY LS LF LF EXCAVATION REMOVE EXISTING TIMBER STAIRCASE 4'-6" WIDTH TIMBER STAIR 8'-0" WIDTH TIMBER STAIR EACH LS CY BENCH EROSION CONTROL STRUCTURAL BACKFILL together with numerous related items of work, all in accordance with Plans and Specifications. COMPLETION OF WORK: All work under the Contract must not begin prior to May 27, 2025, and must be complete by August 28, 2025. Each bid shall be accompanied by a bidder's bond naming Carver County as oblige, certified check payable to the Carver County Treasurer or a cash deposit equal to at least five percent (5%) of the amount of the bid, which shall be forfeited to the County in the event that the bidder fails to enter into a contract. The County reserves the right to retain the deposits of the three lowest bidders for a period not to exceed sixty (60) days after the date and time set of the opening of bids. No bids may be withdrawn for a period of sixty (60) days after the date and time set of the opening of bids. The Carver County Board of Commissioners reserves the right to reject any and all bids, to waive irregularities and informalities therein and further reserves the right to award the contract in the best interests of the County. Questions regarding the project can be answered at the Pre-Bid meeting noted above or by contacting Lucas Simonson with Bolton & Menk, Inc. at lucas.simonson@bolton-menk.com. Question Deadline 03/13/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing to the Issuing Office

Final Planning

Playgrounds / Parks / Athletic Fields

$380,134.00

Public - County

Renovation

16

10

4

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
133
Bidding Soon
1,551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

September 29, 2025

Project location map

Minnewashta Regional Pk Rd, Greenwood, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.