BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a mixed-use development in Excelsior, Minnesota. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Project includes improvement to the existing ballfield and creating ADA concrete walks to fields. Work includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: Removals Site Grading and drainage 9000 SF Exterior concrete walks Concrete stairs and handrails 400 LF Masonry low walls with precast caps Ballfield chain link fencing Tension backstop netting Metal dugout roofs and player benches Landscaping Sod Cut stone benches Seeding and erosion control Wood shed The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. The City Council reserves the right to reject any and all bids and to waive any bids received without explanation. No bid may be withdrawn for a period of 60 days. Site work cannot start till after playing season (September 1, 2025), the field must be ready for play April 1 of 2026. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Award

Playgrounds / Parks / Athletic Fields

$938,203.00

Public - City

Paving, Site Work

36

17

9

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
122
Bidding Soon
1,551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

September 1, 2025

Project location map

135 Lake St, Excelsior, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.