Published March 25, 2025 at 8:00 PM
Updated April 8, 2025
Site work and renovation of a civil project in Osage Beach, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Specifications: Rockway Triplex Lift Station o Dimensions - 14 feet x 14 feet x 17 feet deep concrete wet well. o (1) 8" and (1) 16" gravity line entering the station o (3) 8" pressure lines leaving the station o Concrete lid with (3) single piece 4' x 6' aluminum vault hatches. We will not be able to remove the lid for this process. Scope: The below is a guideline and all manufacture recommendations should be followed, when applicable. Remove the fillet prior to construction and replace it after the wall liner is completed. o Remove any loose coatings or concrete on the existing structure. o Install a series of mechanical anchors to secure the concrete backer to the original structure, along with a bonding agent on the exposed concrete. o Form and weld a chemically resistant thermoplastic HDPE liner along the entire length of the walls. o The liner should be roughly 14 feet tall when complete, roughly 3 feet from the lid. o Minimal thickness of 3 mm o Welded along all seems. o Integral anchors. o Back pressure resistant. o Turn backs where applicable o Pour a high strength concrete backer between the existing wall and the HDPE liner. Backer should be 6 inches. o Apply a Geokrete, or like alternative, coating for the remaining exposed wall area and the under portion of the lid. o Seal around all intrusions in the wet well. o The floor and fillet do not need to be lined. o Final completed length and width dimensions of the wet well should be roughly 13 feet x 13 feet, unless otherwise specified. o All work must be completed prior to Memorial Day or after Labor Day, at the choice of the contractor. o Bid Alternate #1: Contractor provided bypass pumping for the extent needed to complete the project. The City will be responsible for: Bypassing all incoming sewer during the entire process or for 3 weeks, whichever comes first, unless Bid Alternate #1 is accepted. Disposal site for debris. Remove all the wiring and major piping before construction. The five intrusions will remain as straight run stub outs at a length specified by the contractor Minimum length should be roughly 18" to allow for new piping.
Post-Bid
Water / Sewer
$530,000.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2025
May 7, 2025
To Be Determined, Osage Beach, MO
Related To This Project
Osage Beach, MO
Bid Date: Apr 07 2025
Osage Beach, MO
Bid Date: Apr 22 2025
Osage Beach, MO
Bid Date: May 02 2025
Osage Beach, MO
Bid Date: May 23 2025
Osage Beach, MO
Bid Date: Jun 05 2025
Osage Beach, MO
Bid Date: Jun 05 2025
Osage Beach, MO
--
Osage Beach, MO
Bid Date: Jan 08 2025
Osage Beach, MO
--
Osage Beach, MO
Bid Date: Oct 31 2024
Osage Beach, MO
Bid Date: Oct 24 2024
Osage Beach, MO
Bid Date: Nov 14 2024
Osage Beach, MO
Bid Date: Sep 17 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.