BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work, paving and outdoor lighting for a mixed-use development in Morgantown, Pennsylvania. Completed plans call for site work for a municipal facility; road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; and pre-engineered storage facility.

This project provides for the furnishing of all labor, material, equipment and work for the demolition and removal of toll facilities on the Pennsylvania Turnpike (I-76 Toll) at the Morgantown (Exit 298), Downingtown (Exit 312), S.R. 29 (Exit 320), and Valey Forge (Exit 326) interchanges. The work also includes the reconfiguration of electrical systems to maintain operation of the highway lighting and communication systems, securing and placing a pre-fab building at one (1) location and the repurposing of two (2) existing buildings, so they remain complete and operable. Work items include, but are not limited to: 33,678 CY Excavation, Various Classes (Including Pipe Excavation) 798 CY Flowable Fill, Type C (Closure of Existing Tunnels) 832 TON Subbase (No. 2A) (Including Subbase Under Guide Rail) 1,334 TON Superpave Asphalt Mixture, Various Designs 3,683 CY Concrete Pavement Patching (Various Types and Depths) 2,016 LF Guiderail, Type 31-S 4 EA Demolition of Existing Utility Buildings and Toll Plazas - various locations 3 EA Monopipe Sign Structures 3,124 SF Structure Mounted Extruded Aluminum Channel Signs 69,703 LF Pavement Markings (Various Sizes and Colors) 2,211 LF Concrete Median Barrier, Various Types and Sizes 5,750 LF Temporary Concrete Barrier. Milepost 298.33 is located approximately 0.33 miles west of the Morgantown Interchange, Exit 298, in Berks County. Milepost 326.62 is located approximately 0.62 miles east of the Valley Forge Interchange, Exit 326, in Montgomery County. An electronic bid bond, from an approved vendor, with corporate surety, in the amount of five (5%) percent of the bid must be submitted with the proposal as bid security. The bid security of the three (3) low bidders will be retained until the execution of the contract. (The normal time for execution of the contract is approximately four [4] weeks.) Question Deadline 04/25/2025 at 12:00 PM ET Any questions for this project must be submitted electronically in EBS by registered business partners. A Prequalification Certification and Applicable Capacity Rating assigned by the Prequalification Office of the Pennsylvania Department of Transportation is a necessary prerequisite for bidding on this project. The Provisions of the Pennsylvania Prevailing Wage Act of August 15, 1961, P.L. 987, as amended, together with the rates and regulations promulgated by the Secretary of Labor and Industry applicable thereto, shall apply to this contract.

Post-Bid

Roads / Highways

$20,000,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

401

18

11

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
669
Active Projects
322
Bidding Soon
3,972
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

June 30, 2025

Project location map

Multiple Locations, Morgantown, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.