Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Site work, paving and new construction of a mixed-use development in Fort Valley, Georgia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a water / sewer project; and water / sewer project.
Water Infrastructure Improvements The scope of the project shall consist of the following generally described work: Peach County Water Infrastructure Improvements: Contract A: 750,000-gallon elevated water tank - Complete The scope of work in Contract A includes construction of a new 750,000-gallon elevated water storage tank along GA Hwy 49/Peach Parkway in Peach County, GA., within the proposed Peach Parkway water treatment compound. The work in Contract A includes permitting, clearing, grassing, earthwork, grading, erosion control, gravel access driveway, a new 750,000-gallon elevated storage tank, painting, piping, fittings, valves, wiring, electrical components, SCADA, and all necessary material, labor, and appurtenances associated with a complete new elevated water storage tank as shown on the plans and in the specifications. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 5% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability." Performance and Payment Bonds, each in an amount equal to 100% of the contract price, shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond The Fort Valley Utility Commission (FVUC) reserves the right to cancel this solicitation and/or reject any and all proposals in whole or in part if FVUC determines that cancellation and/or rejections are advantageous to the Commission. Proposals are legal and binding upon the Respondent when submitted. It will also be the responsibility of each Bidder to obtain any addenda issued for the project. The written documents supersede any verbal or written prior communications between the parties. Last day for Questions to submit in writing shall be Thursday, April 24, 2025, at 10:00 AM. This project is federally and state funded through the Water and Sewer Infrastructure, State Fiscal Recovery Funds (SFRF) program under the American Rescue Plan Act of 2021 (ARPA). The Project is eligible through the Drinking Water State Revolving Fund (DWSRF) and will be required to comply with the Clean Water Act and applicable state and local laws. The Project is eligible through the Drinking Water State Revolving Fund (DWSRF) and will be required to comply with the Clean Water Act and applicable state and local laws. Bidder must comply with Title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act, and the Contract Work Hours Standard Act. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$500,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2025
June 19, 2025
Multiple Locations, Fort Valley, GA
Related To This Project
Fort Valley, GA
Bid Date: Aug 05 2025
Fort Valley, GA
Bid Date: Aug 05 2025
Fort Valley, GA
Bid Date: Jul 10 2025
Fort Valley, GA
Bid Date: Sep 02 2025
Fort Valley, GA
Bid Date: Aug 08 2025
Fort Valley, GA
Bid Date: Sep 23 2025
Fort Valley, GA
--
Fort Valley, GA
Bid Date: Sep 30 2025
Fort Valley, GA
Bid Date: Apr 17 2025
Fort Valley, GA
Bid Date: Mar 26 2025
Fort Valley, GA
Bid Date: Feb 20 2025
Fort Valley, GA
Bid Date: Jan 03 2025
Fort Valley, GA
Bid Date: Jan 03 2025
Fort Valley, GA
Bid Date: Dec 13 2024
Fort Valley, GA
Bid Date: Dec 03 2024
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
