Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 11, 2025 at 8:00 PM
Updated June 12, 2025
Renovation of a fitness / recreation center in Cortez, Colorado. Completed plans call for the renovation of a fitness / recreation center.
Project was awarded to Sparks Plumbing & Heating, Inc. in the amount of $35,610.05. Reference Number 0000381755 Job Location: Cortez Rec Center 425 Roger Smith Avenue, Cortez, CO 81321 PROJECT TITLE AND DESCRIPTION Remove tile and open wall as needed to remove existing valves and shower heads. Stub out plumbing (hot and cold lines), patch walls, mount stainless-steel tamper-proof housings, sweat in new isolation valves and shower heads in each housing, repair tile and grout as needed. Shower specifications: ensure stainless steel and tamper-proof housings that have isolation valves in each enclosure (See Appendix D). There will be 14 shower enclosures in total, no specific brand is required, but it must be serviceable with replacement parts available. It is important for each shower housing to have the capability to be serviced individually once this project is completed. Additionally, a hot water circulation line loop needs a connection to all locker rooms. All work is within the City of Cortez city limits. The process to be used in the selection of the General Contractor is the Competitive Sealed Best Value Bidding method comprised of two steps as described in Section I (H). SCOPE OF SERVICES a. Scope of Work: The Contractor shall furnish all of the materials and perform all of the work shown on the drawings and described in the specifications for the project titled: 2025 Recreation Center Shower Reconstruction Project, consisting in general terms of the installation of: b. Remove tile and open wall to remove existing valves and shower heads. Stub out plumbing, patch walls, mount tamper proof housings, sweat in new valves and shower heads in house an extend a recirculation line from end shower to return to the main line in each locker room. c. Install a hot water circulation line loop to all locker rooms. d. Install new shower housings and all plumbing connections with isolation valves in each shower housings. 1. Plumbing contractor will be contracted to install new shower housings and all plumbing connections with isolation valves on main line and within each shower housing. Also, add a return recirculation line at the end of each line. 2. Repair tile and grout as needed. Anticipated tile needs are 4in. ceramic white tile, 4 per shower, for a total of 56 tiles. However, the rec center maintenance supervisor will discuss with contractors during the walk through. 3. All work is in the City of Cortez city limits. Work performed shall be of high quality, in compliance with general accepted standards of workmanship, and in conformity with the Contract Documents. Question Deadline 04/17/2025 at 5:00 PM MT Questions are submitted online No Anticipated Construction Start/Finish 06/02/2025 - 08/02/2025 COMPLETION OF WORK: The City of Cortez will require that all of the work be completed within 60 calendar days from the date of the Notice to Proceed. Any extensions of the time limit set forth above must be agreed upon in writing by the parties hereto. Buyer Preferences, Guidelines & Requirements General Requirements - FOB Destination - Installation Required - Insurance Required - Warranty Information Required
Award
Fitness / Rec Centers
$35,610.00
Public - City
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 24, 2025
June 2, 2025
425 Roger Smith Ave, Cortez, CO
Related To This Project
Cortez, CO
Bid Date: May 05 2025
Cortez, CO
Bid Date: May 01 2025
Cortez, CO
Bid Date: May 30 2025
Cortez, CO
Bid Date: May 14 2025
Cortez, CO
Bid Date: May 20 2025
Cortez, CO
Bid Date: May 20 2025
Cortez, CO
Bid Date: May 20 2025
Cortez, CO
Bid Date: Jun 24 2025
Cortez, CO
--
Cortez, CO
--
Cortez, CO
Bid Date: Apr 10 2025
Cortez, CO
Bid Date: Mar 25 2025
Cortez, CO
Bid Date: Mar 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
