Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 9, 2025 at 8:00 PM
Updated July 10, 2025
Site work and renovation of an educational facility in Puyallup, Washington. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.
PROJECT SCOPE The scope of the project includes re-construction of the existing siding atCarson Elementary School. The scope shall include but not limited too; site supervision, temporary fencing, material hoisting,demolition of existing siding and trim, selective demolition of existing weather barrier/rainscreen, installation of new weatherbarrier, joint preparation at similar materials (new joint flashings), installation of new plank siding and trim, caulking,protection of existing metal flashing, removal and reinstallation of exterior attached items, and new painting. Notice toProceed will be issued on or about June 23, 2025, whereupon the site will be available and on-site work may beginimmediately upon the approval of all required documents. See Section Request for Proposal for specific completion times. Theengineer's estimate of the work is $632,600.00. All permits will be provided by the contractor except building permit. Bidders that do not registerwill not be automatically notified of addenda and will need to periodically check with on-line plan room for addenda issued onthis project. BID SECURITY A certified or bank cashier's check payable to the Owner or a bid bondexecuted by a licensed bonding company is required with each bid, in an amount equal to five (5) percent of the Base Bid.Make payable to Puyallup School District and enclose with bid. The Owner shall have the right to rejectany or all bids for any reason or for no reason, to reject a bid not accompanied by required bid security or by other datarequired by the Bidding Documents, or to reject a bid, which is in any way incomplete or irregular. contract issued May 20th District issues Notice to Proceed on site for mobilization on or about June 23,2025 Substantial Completion: August 15, 2025 Final Completion: September 15, 2025 The site is available to the contractor immediately upon execution of the construction contract. Liquidated damages will be included inthe contract at $300/day beyond the date of substantial completion.
Award
Educational
$638,549.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2025
June 23, 2025
8615 184th St E, Puyallup, WA
Related To This Project
Puyallup, WA
Bid Date: Apr 23 2025
Puyallup, WA
--
Puyallup, WA
Bid Date: May 06 2025
Puyallup, WA
Bid Date: May 16 2025
Puyallup, WA
Bid Date: Apr 25 2025
Puyallup, WA
Bid Date: Apr 10 2025
Puyallup, WA
--
Puyallup, WA
Bid Date: Mar 25 2025
Puyallup, WA
Bid Date: Mar 07 2025
Puyallup, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
