Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2025 at 8:00 PM

Updated October 17, 2025

Site work for a water / sewer project in Thomasville, Georgia. Working plans call for site work for a water / sewer project.

As of October 16 2025 have this still on hold Due to the termination of this project’s funding, the current bid date of May 8th, 2025 is no longer available for the acceptance of bids. No further information available as of 5/9/25 Work must be performed by a Georgia licensed utility contractor. The work shall generally consist of furnishing all products and performing all labor necessary to construct the following: Installation of approximately 7,100 L.F. of 30 & 24 sewer rehabilitation via cured in place pipe, 165 V.F. of manhole rehabilitation, sewer main cleaning, bypass pumping, video inspections, manholes replacement and all other appurtenances necessary to complete the project in accordance with the specifications and construction drawings. Questions may be directed to the issuing office, Carter & Sloope, Inc., 24 1st Avenue NE, Moultrie, GA 31768, Phone: 229-668-0663. Bids shall be accompanied by a bid bond or certified cashiers check in an amount not less than 10% of the base bid. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. This project will be partially funded with Federal funds from the United States Environmental Protection Agency and therefore is subject to the Federal laws and regulations associated with that program. Bidders must comply with 41 CFR 60-4, regarding affirmative action and ensure equal opportunity employment and AIS Act requirements. Owner reserves the right to reject bids, waive informalities, and re-advertise. Time allotted for completion of work is 150 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows. A. Questions to Engineer may be submitted via Quest until 12 PM (Noon) on Friday, May 2nd , 2025.

Final Planning

Water / Sewer

$600,000.00

Public - City

Site Work

13

19

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
50
Bidding Soon
523
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

September 17, 2026

Project location map

Multiple Locations, Thomasville, GA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed