BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated May 1, 2025

Demolition, site work, renovation and addition to an educational facility in Ceres, California. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The project will be constructed in three phases under one contract and one DSA application number to accommodate the housing requirements for this existing elementary school. Phase One of the project is currently under construction. Phase Two The work will consist of site demolition work and construction of a new 7,931 s.f. building housing four classrooms and two office areas. The building has an arcade around the perimeter of the building. The building will be situated between three existing buildings. The building is wood framed, slab on grade with a masonry veneer and stucco wall finishes. There is sloped hip roof with concrete tiles and a mechanical well with a TPO roof membrane. The interior will have carpet flooring, vinyl wrapped tackboard wall finish, suspended T-bar ceiling and plastic laminated casework. Roof mounted solar panels with battery storage system. Roof mounted HVAC package units and ductwork. New electrical power service to the building and distribution throughout the building. Low voltage communication systems within the building interconnected to the school site office. Alterations to an existing restroom building, housing two student restrooms, two staff restrooms, custodial and mechanical rooms. The building is 1,200 s.f. in area. The exterior walls are concrete masonry units. A hip sloped roof with concrete tiles. The interior wall and floor surfaces along with plumbing fixtures will be demolished. The rooms will be altered to meet ADA accessibility requirements. New polished concrete floors, FRP wall and ceiling finishes, new plumbing fixtures and partitions. Replacement of light fixtures and low voltage systems. Site work will include the rerouting of an existing storm drain line and new manholes. Extending sewer, water, and gas to the building. New concrete flatwork and asphaltic pavement. New on-site fire hydrant. New French drain storm water collection system and in-fill of an existing storm water retention basin. New irrigation and landscaping improvements. Phase Three The work in this phase will consist of the demolition of eight portable classrooms on wood foundations and utilities to the buildings. Pressure grouting of an abandoned TID irrigation pipe line. Construction of two new 5,118 s.f buildings (10,314s.f. total) each housing four classrooms. Each building will have an arcade along the westerly side. Each building is wood framed, slab on grade with a masonry veneer and stucco wall finishes. Each building has a sloped hip roof with concrete tiles and a mechanical well with a TPO roof membrane. The interior of each classroom will have carpet flooring, vinyl wrapped tackboard wall finish, suspended T-bar ceiling and plastic laminated casework. Roof mounted solar panels with battery storage system. Roof mounted HVAC package units and ductwork for each classroom. New electrical power service to each building and distribution throughout each building. Low voltage communication systems within each building interconnected to the school site office. Access to the construction areas is limited by existing paths of travel from the street to each phase of the work. This is a traditional school year campus with summer school activities The Board reserves the right to reject any or all proposals, and further reserves the right to waive any formalities or irregularities in the proposals. Question Deadline: 04/23/2025 at 4:30 PM PT Any questions regarding this RFP or selection process may be directed to Anna-Maria Trimboli. atrimboli@ceres.k12.ca.us

Post-Bid

Educational

$8,500,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

May 30, 2025

Project location map

3618 Helen Perry Rd, Ceres, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.