Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 16, 2025 at 8:00 PM
Updated May 17, 2025
Renovation of a warehouse / distribution facility in Pasco, Washington. Completed plans call for the renovation of a warehouse / distribution facility.
Work: The project involves construction of a metal canopy structure at Warehouse 2 Bay 3. Plans are attached as Drawings G-01 through G-03, PH-01, A-01, A-02 and Meier Engineering & Architecture drawings S001, S101, S501, S502 and S503. General demolition at each building includes, but is not limited to, removal of T&G wood siding, translucent window panels, metal siding panels, etc. to install all necessary steel and steel supports for canopies, any required demo for installation of new canopies and dry pipe sprinkler system. Question Deadline 05/06/2025 Questions may be directed to Matt Whitish at Ph. 509.783.2244 or Jaime Vera, Ph. 509.547.3378. Architects Action: Architect will review each RFI, determine action required, and respond. Allow seven working days for architects response for each RFI. Start Date and Contract Time: Work will begin within 10 days after the execution of the contract and/or Notice to Proceed, and require completion not to exceed 30 calendar days. A certified check, cashiers check or bid bond made payable to the Port of Pasco for an amount equal to at least 5% of the total base bid amount shall accompany each bid. The Contractor shall furnish performance and payment bonds, each in an amount at least equal to the Contract Price, as required by R.C.W. 39.08, upon execution of a contract. These bonds shall remain in effect until one year after the date when final payment becomes due. In lieu of the said performance and payment bonds, and in the event the contract is for an amount less than $150,000.00, The Port of Pasco reserves the right to reject any or all bids, to waive any informalities or irregularities in any bid, or in the bidding, and to accept or reject any bid for reasons based solely on considerations for the best interests of the Port of Pasco.
Post-Bid
Warehouse / Distribution
$580,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2025
June 16, 2025
Multiple Locations, Pasco, WA
Related To This Project
Pasco, WA
Bid Date: May 15 2025
Pasco, WA
Bid Date: Sep 11 2025
Pasco, WA
Bid Date: May 23 2025
Pasco, WA
Bid Date: Jun 12 2025
Pasco, WA
Bid Date: May 16 2025
Pasco, WA
Bid Date: Apr 22 2025
Pasco, WA
Bid Date: May 07 2025
Pasco, WA
Bid Date: Apr 10 2025
Pasco, WA
Bid Date: Apr 02 2025
Pasco, WA
Bid Date: Apr 16 2025
Pasco, WA
Bid Date: Mar 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
