BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2025 at 8:00 PM

Updated May 21, 2025

Site work for a power facility in Wayne, Nebraska. Completed plans call for site work for a power facility.

The equipment is described in general as follows: A new lineup of 15 kV indoor metalclad switchgear Including eight (8) vacuum circuit breakers, with related relaying, controls, accessories, and detailed drawings. 0ne(1) new transformer control panel and related relaying, controls, accessories, & detailed drawings. The above work shall be in accordance with the specifications and proposed form of contract now on file in the office of the City in said City of Wayne, Nebraska, by this reference made a part hereof, as though fully set out and incorporated herein. Each bid shall be made out on bid forms furnished by the Engineer and shall be accompanied by either a certified check or a bid bond executed in an amount of not less than five percent (5%) of the amount of the Bid. The bid security shall be made payable to the City of Wayne. The bid security must not contain any conditions either in the body or as an endorsement thereon. Such bid security shall be forfeited to the City of Wayne as liquidated damages in the event the successful bidder fails or refuses to enter into a contract and post a satisfactory Performance Bond. Bids received after the time set for the opening of bids will be returned to the bidder unopened. The bids must be on the official bid forms and emailed to betty@cityofwayne.org and wblecke@ cityofwayne.org or submitted in a sealed envelope addressed to the City Clerk with the words "Bid Enclosed - Furnishing 15 kV Switchgear and 69 kV Control Panel - Northeast Substation Upon shipment of the complete equipment, the Supplier shall submit to the Owner a detailed statement of the equipment shipped and installed. The Owner shall, within thirty (30) days after delivery receipt of the material and associated invoice, pay the Supplier ninety-five percent (95%) of the contract price of the material. The Owner shall within thirty (30) days after final completion, field assembly, testing, required test reports, record drawings, final documentation and certification by Engineer, pay the Supplier the remaining five percent (5%) of the contract price of the material. All materials shall be delivered by the dates set in the Specifications. The Wayne City Council reserves the right to defer acceptance of any bid for a period not to exceed thirty (30) days after the date bids are opened and no bid may be withdrawn during this period. The City Council also reserves the right to reject any or all bids and enter into such contract as it shall deem to be in the best interest of the City of Wayne..

Award

Power Plant

$622,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
76
Bidding Soon
824
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 12, 2025

Project location map

To Be Determined, Wayne, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.