Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

This is a service / maintenance or supply contract in Moline, Illinois. Contact the soliciting agency for additional information.

This project requires 27% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 24, 2025, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase III engineering services are required for construction contract 64R16: milling, patching, and HMA resurfacing on I-280 from Milan Beltway to I-74/US6 Interchange and I-74 from I-280/US6 Interchange to Henry County line. The Consultant must provide sufficient staff to perform all engineering services required to complete the project in accordance with departmental guidelines. This may include, but is not limited to all on-site construction inspection, documentation of pay quantities and related forms for record keeping, Construction & Materials Management System (CMMS) documentation, onsite Quality Assurance material testing, night-time inspection as needed, verification of construction layout including GPS work for layout and documentation, submittal of pay estimates, change orders, and all other work required to complete the project in a timely manner. The Consultant will be responsible to ensure contractors complete the work in accordance with the plans and specifications. It is anticipated the department will do all off-site material inspection for the project, and the Consultant will do all on-site material inspection and documentation, including CMMS Materials documentation and PCC Quality Assurance testing as needed. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The anticipated construction completion date is June 30, 2026 The method of contractor selection has not been determined at this time. IL DOT - 31 - RFQ - I-280 and I-74 Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
92
Bidding Soon
1,227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

Project location map

I-74 & I-280, Moline, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.