Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 13, 2025 at 8:00 PM
Updated June 14, 2025
Renovation of a fitness / recreation center in Aspen, Colorado. Completed plans call for the renovation of a fitness / recreation center.
Reference Number 0000387150 The project will include, but is not limited to: Assessing and measuring doorways, corners and lower registers of Aspen Recreation Center exterior siding for replacement; sourcing specific siding to match (in color, texture and gauge) existing undamaged product installed on higher registers of building; provide installation which may include retrofitting, crimping, cutting in transition areas to connect current and new product; securing building with proper trim and flashing and potentially moisture barriers to safeguard from weather exposure. Question Deadline 06/03/2025 at 11:59 PM MT Questions are submitted online Yes Bonding Requirements - Performance Bond 100 % - Maintenance Bond 100 % - Payment Bond 100 % The City reserves the right to reject any or all Proposals or accept what is, in its judgment, the Proposal which is in the City's best interest. The City further reserves the right, in the best interests of the City, to accept a late submittal or to waive any technical defects or irregularities in any and all Proposals submitted. Scope of Work Source replacement material - All sheet metal, trim, flashing should be ordered to replace all damaged panels, corners, doorways, flashing and trim to match current aesthetic in color, texture, gauge and scale. A Morin product is currently on the exterior (EXHIBIT C). Modifications, where necessary, may be required to marry currently installed product with newly sourced materials. If an alternative is being proposed then please send the samples to Procurement at City Hall Attn: Procurement 427 Rio Grande Aspen, CO 81611. Samples should be sent to Procurement preferably prior to proposal closing on Thursday, June 12 th , otherwise no later than 4 days after proposal closing. Assessing areas of weather exposure – to install moisture/weather barriers and present solutions to protect future exposure (solutions may include: placement of staggard seams, thicker trim pieces, etc.) Removal and disposal of damaged material – All metal material is to be taken to the local landfill for recycling. Transporting all replacement materials and equipment to/from job site – Source all material and equipment to job site for custom cuts and fits and clean up/dispose/recycle/store accordingly. Execution of project – Job should be completed by October 1, 2025 before winter weather conditions arrive in Aspen. Preference for work to be completed by August 15, 2025, or during the summer schedule. NOTE: Due to a pre-scheduled outdoor event, the facility will not be available July 17-21, 2025. If you are a non-local bidder, please provide detailed information regarding your travel expenses, distance, time, and any other relevant details. This will help demonstrate that, despite being non-local, your company can meet our requirements satisfactorily
Post-Bid
Fitness / Rec Centers
$100,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2025
July 14, 2025
0861 Maroon Creek Rd, Aspen, CO
Related To This Project
Aspen, CO
Bid Date: Jun 06 2025
Aspen, CO
--
Aspen, CO
--
Aspen, CO
Bid Date: Jun 27 2025
Aspen, CO
Bid Date: Jun 27 2025
Aspen, CO
Bid Date: Jul 01 2025
Aspen, CO
Bid Date: Jul 18 2025
Aspen, CO
Bid Date: May 23 2025
Aspen, CO
Bid Date: May 30 2025
Aspen, CO
Bid Date: May 21 2025
Aspen, CO
Bid Date: Oct 30 2020
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
