BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2025 at 8:00 PM

Updated August 12, 2025

Site work and environmental remediation for a municipal facility in Waterbury, Connecticut. Completed plans call for site work for a municipal facility; and for environmental remediation for a municipal facility.

The Site consists of two adjoining parcels including the northernmost parcel known as 359 Mill Street (359 Mill) and the southernmost parcel known as 777 South Main Street. The first portion of the Site, 359 Mill is a 1.29-acre parcel owned by the City of Waterbury which is primarily occupied by a 4,500-square foot metal building constructed in 2019. The remainder of the property is mainly occupied by paved parking and landscaping associated with the recently constructed building. The second portion of the Site, 777 South Main, is an irregularshaped, 1.96-acre, City-owned, which was previously developed with a historical industrial facility, is currently vacant with the exception of several concrete slabs, foundation remnants and basement areas remaining from the former site structures. In 2018, the 359 Mill parcel was entered in the DEEP Voluntary Remediation Program (VRP). On August 28, 2024, 777 South Main was accepted into the Brownfield Remediation and Revitalization Program (BRRP), a remediation program administered by DECD and the DEEP. There will be two phases: Phase I is the remediation and Phase II construction. Phase I Remediation- The scope of work consists of the excavation and replacement of impacted soils and the use of clean fill material rendering the properties in compliance with Remediation Standard Regulations. Site remediation is designed to address: Polychlorinated Biphenyls ("PCB"), Heavy Metals, Semi-Volatile Organic Compounds, and Petroleum Hydrocarbons. The work will be administered by our Licensed Environmental Professional (LEP)- WSP Consultants. Phase II Construction- This is the future scope of work where the City intends to install few greenhouses at Food Hub and redevelop 777 S Main with a pavilion and a cafe. Phase II is not included in this ITB. Final completion shall be no later than 150 days upon Notice to Proceed. Clarification Deadline 6/6/2025 2:00 PM

Bid Results

Municipal

$2,223,600.00

Public - City

Environmental Remediation, Site Work

8

13

2

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
6
Bidding Soon
3,810
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

July 18, 2025

Project location map

Multiple Locations, Waterbury, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.