Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 11, 2025 at 8:00 PM
Updated August 12, 2025
Site work and environmental remediation for a municipal facility in Waterbury, Connecticut. Completed plans call for site work for a municipal facility; and for environmental remediation for a municipal facility.
The Site consists of two adjoining parcels including the northernmost parcel known as 359 Mill Street (359 Mill) and the southernmost parcel known as 777 South Main Street. The first portion of the Site, 359 Mill is a 1.29-acre parcel owned by the City of Waterbury which is primarily occupied by a 4,500-square foot metal building constructed in 2019. The remainder of the property is mainly occupied by paved parking and landscaping associated with the recently constructed building. The second portion of the Site, 777 South Main, is an irregularshaped, 1.96-acre, City-owned, which was previously developed with a historical industrial facility, is currently vacant with the exception of several concrete slabs, foundation remnants and basement areas remaining from the former site structures. In 2018, the 359 Mill parcel was entered in the DEEP Voluntary Remediation Program (VRP). On August 28, 2024, 777 South Main was accepted into the Brownfield Remediation and Revitalization Program (BRRP), a remediation program administered by DECD and the DEEP. There will be two phases: Phase I is the remediation and Phase II construction. Phase I Remediation- The scope of work consists of the excavation and replacement of impacted soils and the use of clean fill material rendering the properties in compliance with Remediation Standard Regulations. Site remediation is designed to address: Polychlorinated Biphenyls ("PCB"), Heavy Metals, Semi-Volatile Organic Compounds, and Petroleum Hydrocarbons. The work will be administered by our Licensed Environmental Professional (LEP)- WSP Consultants. Phase II Construction- This is the future scope of work where the City intends to install few greenhouses at Food Hub and redevelop 777 S Main with a pavilion and a cafe. Phase II is not included in this ITB. Final completion shall be no later than 150 days upon Notice to Proceed. Clarification Deadline 6/6/2025 2:00 PM
Bid Results
Municipal
$2,223,600.00
Public - City
Environmental Remediation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2025
July 18, 2025
Multiple Locations, Waterbury, CT
Related To This Project
Waterbury, CT
Bid Date: Jun 11 2025
Waterbury, CT
Bid Date: Jun 18 2025
Waterbury, CT
Bid Date: Jul 01 2025
Waterbury, CT
Bid Date: Jun 24 2025
Waterbury, CT
Bid Date: Jun 27 2025
Waterbury, CT
Bid Date: Apr 12 2021
Waterbury, CT
Bid Date: Nov 09 2020
Waterbury, CT
Bid Date: Apr 03 2019
Waterbury, CT
Bid Date: Aug 02 2019
Waterbury, CT
Bid Date: Jun 17 2025
Waterbury, CT
Bid Date: Jun 25 2025
Waterbury, CT
Bid Date: Jul 02 2025
Waterbury, CT
Bid Date: Jun 18 2025
Waterbury, CT
Bid Date: Jul 01 2025
Waterbury, CT
Bid Date: Jun 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
