BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 27, 2025

Renovation of an educational facility in Bonanza, Oregon. Completed plans call for the renovation of a educational facility.

The work contemplated consists of the following and separated into two phases: PHASE 1 - Front facade glazing replacement, with window treatments. Remove and replace the glass within the existing storefront windows as noted within the plans. Provide new window treatments per plans. This work is planned to be performed during the Summer of 2025. PHASE 2 - Back facade window and trim replacement, with window treatments. Remove the old glass and wood window trim and completely and replace with new storefront window package to match the front facade as noted within the plans. Provide new window treatments per plans.

Post-Bid

Educational

$1,650,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
2
Bidding Soon
45
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

August 25, 2025

Project location map

31601 Mission St, Bonanza, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.