BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and paving for a mixed-use development in Carmel, Indiana. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of July 16, 2025, the project was awarded to HIS Constructors, Inc., with an awarded amount of $2,886,045.90.** A bid bond or certified check in an amount not less than ten percent (10%) of the amount bid must be submitted with each bid. A one hundred percent (100%) performance and payment bond will also be required of the successful bidder. It is intended that actual construction of all work divisions shall be started as soon as practicable, and each bidder shall be prepared to enter promptly into a construction contract, furnish a performance bond, and begin work without delay in the event the award is made to him. The Project consists of, but is not necessarily limited to, the following: The project consists of a 10' HMA multi-use trail on the east side of Westfield Blvd beginning at 99th St and an 8' HMA multi-use trail on the west side of Westfield Blvd beginning at 101st Street. The trails have a project exemption from Timber Heights Dr to approximately 600' North of 106th street for a future roundabout. The paths continue to connect to existing paths south of 116th street. The project includes cutting existing roadway asphalt to install curb alongside the path and a 12' x 6' box culvert. Contract Documents and drawings for the Project can be found in this solicitation and the attachments section. Event pre-bid note: Microsoft Teams: https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDM2MjU4ZDItMjc3NS00OGZhLTkyM2MtZjNkOGY4YjEyMjJk%40thread.v2/0context=%7b%22Tid%22%3a%2229565137-14ea-4fb1-b008-e8c62d90aa44%22%2c%22Oid%22%3a%22a53a3183-74ae-41f7-a5a9-9020f0385396%22%7d Meeting ID: 260 307 863 964 9 Passcode: 3Ds3qu9o. All prospective bidders are invited to attend the pre-bid conference. The pre-bid conference is Non-Mandatory. The City of Carmel reserves the right to reject and/or cancel any and all bids, solicitations and/or offers in whole or in part as specified in the solicitations when it is not in the best interests of the governmental body as determined by the purchasing agency in accordance with IC 5-22-18-2. Question Submission Deadline:June 26, 2025, 5:00pm Phase 1 consists of all work south of 106 th Street Phase 2 consists of all work north of 106 th Street The Substantial Project Completion Date for Phase 1 is based on a Notice to Proceed by the OWNER given on or before July 16, 2025 for the construction of Specified work. All road closures must meet the requirements of TS 22 and TS 23 Section 103, Begin Line 638 of the Standard Specifications, Delete and Insert as Follows: The named insured in this policy shall be City of Carmel, c/o Board of Public Works and Safety. Bid Results: Structure Replacement - HIS Constructors, Inc - $784,145.00 Multi-Use Path- HIS Constructors, Inc - $2,101,901

Award

Sidewalks / Parking Lot

$2,886,046.00

Public - City

Paving, Site Work

99

12

83

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
125
Bidding Soon
1,208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

August 18, 2025

Project location map

Westfield Blvd, Carmel, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.