Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 20, 2025 at 8:00 PM
Updated July 15, 2025
Renovation of an educational facility in Rocky River, Ohio. Completed plans call for the renovation of a educational facility.
all labor and material necessary for the Indoor High School Gymnasium Scoreboard Project pursuant to the sufficient information contained in the instructions to bidders and notice, which is posted on the Board's internet website at Online, and may be accessed by going to Online. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. BOARD ONE: 14' x 8' SCOREBOARD (approximate dimensions) o Compatible with Board Two o 5" amber and red LED digits with protective shields o Five player point foul panel set o Backboard light set o Home/Guest score up to 199 o Double bonus and possession indicators o Galvanized steel cabinet with powder coat finish o Designed to be mounted to the wall o All necessary mounting hardware and structural supports o Wireless remote control with internal rechargeable battery o Built-in-Horn o Custom logos o Wiring o Cable o Circuit Breakers o Permitting o Delivery (freight/shipping included) o Integration with existing power infrastructure o Stafftraining in system operation and maintenance o 24/7 technical support o Regular maintenance schedule o Minimum five-years warranty with the option to purchase extended limited warranties o Full compliance with all applicable state, federal and local laws, rules and regulations. BOARD TWO: 9' x 6' SCOREBOARD (approximate dimensions) o Compatible with Board One o 5" amber and red LED digits with protective shields o Backboard light set o Home/Guest score up to 199 o Double bonus and possession indicators o Galvanized steel cabinet with powder coat finish o Designed to be mounted to the wall o All necessary mounting hardware and structural supports o Wireless remote control with internal rechargeable battery o Built-in-Horn o Custom logos o Wiring o Cable o Circuit Breakers o Permitting o Delivery (freight/shipping included) o Integration with existing power infrastructure o Stafftraining in system operation and maintenance o 24/7 technical support o Regular maintenance schedule o Minimum five-years warranty with the option to purchase extended limited warranties o Full compliance with all applicable state, federal and local laws, rules and regulations INSTALLATION (add alternative optional) o Complete take-down/removal ofexisting scoreboard system as scheduled by the Board. o Complete installation including data (hard wired) and electrical connections as scheduled by the Board. The desired project completion date is October 1, 2025 The total estimated cost of both labor and materials for an equivalent scoreboard system is between $20,000 to $50,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Educational
$50,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 14, 2025
August 13, 2025
1101 Morewood Pkwy, Rocky River, OH
Related To This Project
Rocky River, OH
Bid Date: Jun 27 2025
Rocky River, OH
Bid Date: Jul 25 2025
Rocky River, OH
Bid Date: Aug 08 2025
Rocky River, OH
Bid Date: Aug 08 2025
Rocky River, OH
Bid Date: Sep 15 2025
Rocky River, OH
Bid Date: Oct 16 2020
Rocky River, OH
Bid Date: Sep 26 2025
Rocky River, OH
Bid Date: Sep 19 2025
Rocky River, OH
Bid Date: Jun 13 2025
Rocky River, OH
Bid Date: Jun 23 2025
Rocky River, OH
Bid Date: Jun 16 2025
Rocky River, OH
--
Rocky River, OH
Bid Date: May 16 2025
Rocky River, OH
Bid Date: May 16 2025
Rocky River, OH
Bid Date: Apr 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
