BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and paving for a road / highway in Southport, Indiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Infrastructure Preservation and Improvements in Various Townships S. County Line Rd. & Madison Ave. Intersection Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Scope:- The Work consists of, but is not necessarily limited to the following: Intersection improvements at County Line Road and Madison Avenue including resurfacing on each approach, ADA curb ramp reconstruction, updated signal timing, new signs and markings, and an extended westbound left turn lane. Doc.Note* Contract Documents for the Project/Work have been assembled into one or more bound Project Manuals which, together with Drawings, may be examined at online or at the following locations: City of Indianapolis Purchasing Department 200 East Washington Street Suite 1522, City-County Building Indianapolis, Indiana 46204. The participation goal for Minority Business Enterprise (MBE) for this contract is fifteen percent (15%). The participation goal for Women Business Enterprise (WBE) for this contract is eight percent (8%). The participation goal for Veteran Business Enterprise (VBE) is three percent (3%). The participation goal for Disability-owned Business Enterprise (DOBE) is one percent (1%). Intermediate Completion for all pavement pay items on or before 12/31/2025, Substantial Completion on or before 6/30/2026, and Final Completion on or before 8/14/2026 Question Deadline 07/10/2025 If a Bidder finds conflicts, errors, discrepancies or ambiguities in the Contract Documents or any sample form, or if the Bidder is in doubt as to the intended meaning of any portion or provision therein, the Bidder shall at once give written notice thereof to the Owner's Representative, at least seven (7) consecutive calendar days prior to the Bid Date.

Award

Roads / Highways

$1,307,000.00

Public - City

Paving, Site Work

45

11

16

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
84
Bidding Soon
1,207
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

September 15, 2025

Project location map

Madison Ave & W County Line Rd, Southport, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.