Demolition, site work and addition to a municipal facility in Covington, Georgia. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.

The Newton County Water and Sewerage Authority (NCWSA) plans to design and construct an Administration Building Expansion Project to improve accessibility, expand workspace and increase meeting space and expand workspace to accommodate approximately 100 people for public meetings and Board meetings. The scope of work of the CMAR will be performed in two or more phases under a single contract with contract amendments, as needed, for successive project phases. Phase I Services (the Pre-Construction Phase) will include design and constructability reviews, cost estimating and cost control (value engineering) services, project schedule development, procurement strategy development, and the preparation and submission of an open-book GMP, including the firm cost of the work through construction commissioning, start-up and the warranty period. Phase II Services, including the construction phase (and additional phases, as deemed appropriate), will include the CMARs procurement, award, construction and construction management of principal and specialty trade contracts and subcontracts to provide construction, start-up, commissioning, operator training, performance testing, and warranty services necessary for the Project implementation. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Newton County Water and Sewerage Authority (NCWSA) plans to design and construct an Administration Building Expansion Project to improve accessibility, expand workspace and increase meeting space and expand workspace to accommodate approximately 100 people for public meetings and Board meetings. The project is anticipated to generally include the following improvements: o Expansion of existing Administration Building o Accommodation for Board Meetings o Accommodation for public access and meeting space o Possible renovation of existing workspace in the Administration Building o Maintenance/Enhancements to security for work areas The estimated construction budget for the project is $3,000,000 to $5,000,000 including but not limited to construction, start-up, and commissioning *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Pre- Proposal Questionnaires Due July 21 st 2025 - Ms. Laurie Ashmore, P.E. Chief Engineer NCWSA 11325 Brown Bridge Road Covington, GA 30016 Phone: (770) 385-3923 Email: la@ncwsa.us Award: September 18th, 2025 Contract Negotiation: Sept 22nd- Sept 30th, 2025 Notice To Proceed: October 1st, 2025

Post-Bid

Municipal

$5,000,000.00

Public - County

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
149
Bidding Soon
1,956
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

October 1, 2025

Project location map

11325 Brown Bridge Rd, Covington, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.