BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Demolition, site work and new construction of a bridge / tunnel in West Springfield, Massachusetts. Design plans call for the construction of a bridge / tunnel.

As of July 28, 2025, an engineer has been selected and this project is 25% pre-design phase. The project will be a design/build project and it is on the 2027 TIP. Early letters of interest would start in 2026. The construction timeline remains to be finalized; however, the project is expected to span four years once underway. Engineer firm information has not been determined. Plans to replace the Arthur J. McKenna Bridge in Springfield and West Springfield. The proejct will also inlcude the rehabilitation of the Route 5 Underpass.

Design

Bridges / Tunnels

$234,000,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
685
Active Projects
350
Bidding Soon
4,809
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2027

Project location map

N End Brg, West Springfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.