Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 27, 2025 at 8:00 PM
Updated July 11, 2025
This is a service / maintenance or supply contract in Hamilton, Ontario. Contact the soliciting agency for additional information.
The Township of North Dundas requires Snow Loading along Sidewalks and Roadways, when required, for the three winter seasons commencing November 15, 2025 through to April 1, 2028, at the following locations: Village of Winchester Village of Chesterville - PROVISIONAL Village of South Mountain - PROVISIONAL The Township of North Dundas staff typically plow snow from Township roadways and sidewalks in the winter season. After a certain duration, the plowed snow forms banks between sidewalks and roadways. Township staff endeavor to remove the snowbanks as time permits. However, during major storm events or when needed, the Township sometimes calls a stand-by contractor to remove snowbanks between the sidewalks and roadways and from any parking areas, due to limited staff and equipment availability. The current level of service is to remove snowbanks upon call-in to allow customers from shops and businesses to access their parked cars in the Business Sections/main streets of a village. If a storm continues to persist, the Township may require further snow loading alongside roads in Winchester, Chesterville and South Mountain. Snow hauling will be performed by the Township of North Dundas. The Township of North Dundas will pay a stand-by amount for a tractor, blower and backhoe, as indicated in the Bid Form, from November 15 to April 1 of each year. The stand-by amount is to offset the cost of having a tractor, blower and backhoe readily available to the Township of North Dundas. The Township of North Dundas requires that all equipment hired from this tender be harnessed, set up, and available for inspection by November 15 of each year and, pending approval of inspection of equipment, remain on call until April 1 of each year. Question Deadline: Thu Jul 3, 2025 3:00 PM (EDT)
Post-Bid
Sidewalks / Parking Lot
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
November 15, 2025
Multiple Locations, Hamilton, ON
Related To This Project
Hamilton, ON
Bid Date: Jul 18 2025
Hamilton, ON
Bid Date: Dec 17 2025
Hamilton, ON
Bid Date: Jul 03 2025
Hamilton, ON
Bid Date: Jul 31 2025
Hamilton, ON
Bid Date: Aug 05 2025
Hamilton, ON
Bid Date: Aug 05 2025
Hamilton, ON
Bid Date: Jul 10 2025
Hamilton, ON
Bid Date: Jul 31 2025
Hamilton, ON
Bid Date: Jul 08 2025
Hamilton, ON
Bid Date: Jul 02 2025
Hamilton, ON
Bid Date: Jul 16 2025
Hamilton, ON
Bid Date: Jun 26 2025
Hamilton, ON
Bid Date: Jul 02 2025
Hamilton, ON
Bid Date: Jun 27 2025
Hamilton, ON
Bid Date: Jul 03 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
