BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work for a civil project in Douglas, Wyoming. Completed plans call for site work for a water / sewer project.

Site Directions: From I-25, take exit 140 into Douglas. Continue on W. Yellowstone past the first set of traffic lights for 3/4 of a mile. Then turn left onto W. Grant Street. Follow W. Grant Street for 600 feet and your destination is on the left. The City of Douglas Water Treatment Plant Intake Structure Slide Gate Replacement Project consists of the removal and replacement of the 18-inch and 24-inch cast iron slide gates at the intake structure. The contractor shall install the owner procured cast iron slide gates according to the manufacturer's recommendations and project specifications. The total number of slides gates being installed are 5 18-inch slide gates and 1 24-inch slide gate. Question Deadline 07/25/2025

Award

Water / Sewer

$34,905.00

Public - City

Site Work

8

9

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
3
Bidding Soon
160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

August 29, 2025

Project location map

I-25, Douglas, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.