Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
This is a service / maintenance or supply contract in Bellows Falls, Vermont. Contact the soliciting agency for additional information.
The Hotel Windham, built in 1933, is roughly two city blocks and is an important central landmark in the square of the Bellows Falls Downtown. In the early 2000's, ground floor commercial spaces were refurbished, windows restored, and long-term tenants secured. Successful businesses continue to operate these storefronts including jeweler, bookstore, artisan retail, and restaurant with event space. Windows on the second and third floor were replaced, but these upper stories have been vacant since 1984, and Bellows Falls still does not have a hotel. Question Deadline 07/29/2025 at 4:00 PM ET Tuesday, August 5, 2025 Responses due by 4 p.m. The purpose of this solicitation is to secure marketing research and data services from qualified consultants to perform a comprehensive market feasibility study for preferred alternatives for housing and/or hotel rooms in the Hotel Windham building owned by the Windham Development Group. Objectives The objective is for the Consultants to present 3-4 preferred alternatives for market feasibility of the return on investment for the use of this vacant space, and recommendations for the organizational structure for ownership on a final preferred alternative based upon Steering Committee, public input, community vision, and market data for final feasible uses as hotel, housing, or mixed-use model. Scope of Work and Deliverables The Consultant shall perform the following tasks as part of the Market Feasibility Study: 1) Kick-off Meeting with Steering Committee -discuss existing conditions and formulate a plan about public engagement, organizational ownership structure and visions. 2) Preparation and Site Visit a. Site visit and inspection- existing conditions, impression of building and spaces Town of Rockingham 7 The Square, PO Box 370 Bellows Falls, VT 05101 Tel: 802-463-3964 b. Survey for code compliance - identify all permits required, necessary code upgrades, associated contacts and all costs. c. Analyze and assess previous studies, existing condition and data collection 3) Public Meeting to present existing conditions and first impressions. Collect input and ideas to inform a community vision for the building 4) Develop a conceptual model from the research and collection of assimilated data, community vision and models for organizational structure 5) Meeting with Steering Committee to validate community input and vision, data collection and research. Discuss conclusions to ensure 6) Data Collection - collect market data for optimal use of the facility based on the community's vision, needs and the market feasibility of the return on investment (ROI). 7) Research - research housing and short-term stay models, i.e. hotels, workforce, market rate, missing middle, affordable housing, senior living, condominium, and/or mixed-use with hotel/short-term and housing. This should be shared as a source for the alternatives and final preferred alternative. 8) Meeting with Steering Committee - Online meeting to present the alternatives analysis and discussion and agreement on 3-4 alternatives for optimal use and ROI based on vision 9) Public Meeting to present 3-4 alternatives to the public and collect input 10) Further analysis and assessment of data collection, research and community vision to present findings to Steering Committee. 11) Meet with Steering Committee- Online meeting to choose one preferred alternative 12) The final report for the preferred alternative to be presented at the final public meeting should include: a. Alternatives analysis detailing preferred alternative including organizational structure of the entire building, e.g. commercial ground floor, second and third stories and the basement and shared services. b. Conceptual model with detail of how it meets and addresses existing conditions including set goals for; contamination, condition, zoning, density, floor plan. The model should reference the market data and research used in determining the model for housing/hotel or mixed-use. c. Develop list of funding opportunities including ownership model and use for ROI d. Recommendations for implementation- phases / scheduled (i.e. short-term to long-term, cheapest to most expensive, easiest to achieve to most complicated) The method of Contractor Selection has not been Determined at this time.
Conceptual
Hotel / Motel
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2026
To Be Determined, Bellows Falls, VT
Related To This Project
Bellows Falls, VT
Bid Date: Oct 06 2025
Bellows Falls, VT
--
Bellows Falls, VT
Bid Date: Apr 01 2025
Bellows Falls, VT
Bid Date: Apr 03 2019
Fayston, VT
Bid Date: Jul 29 2025
Northfield, VT
Bid Date: Jul 29 2025
Vershire, VT
Bid Date: Aug 14 2025
Winooski, VT
Bid Date: Jul 25 2025
Franklin, VT
Bid Date: Jul 28 2025
Rutland, VT
Bid Date: Aug 01 2025
Waterbury, VT
Bid Date: Jul 29 2025
Fairfax, VT
Bid Date: Aug 01 2025
Fairfax, VT
Bid Date: Aug 01 2025
Colchester, VT
Bid Date: Aug 29 2025
Burlington, VT
Bid Date: Aug 11 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
