Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 27, 2025 at 8:00 PM
Updated October 28, 2025
Site work for a bridge / tunnel in Half Moon Bay, California. Completed plans call for site work for a bridge / tunnel.
Replace the Existing Pullman Ditch Culvert, Extents of the Half Moon Bay Coastal Trail and Roosevelt Beach Access Road at Half Moon Bay State Beach in San Mateo County, California. Furnish all labor, materials, tools and equipment necessary to replace the existing Pullman Ditch culvert, extents of the Half Moon Bay Coastal Trail and Roosevelt Beach access road at HALF MOON BAY STATE BEACH in San Mateo County, California, complete and in accordance with the plans and specifications therefore and such addenda thereto as may be issued prior to bid opening date. this project will reconstruct the existing pullman ditch culvert and extents of the half moon bay coastal trail and roosevelt beach access road at half moon bay roosevelt beach. improvement will consist of full replacement of the pullman ditch culvert to allow for proper drainage control. Project Location: Half Moon Bay State Beach Roosevelt Beach Question Deadline 08/19/2025 at 2:00 PM PT - Questions and Answers: Any Discrepancies, Omissions, Ambiguities, or Conflicts in or Among the Contract Documents or Doubts as to Meaning Shall Be Brought to the State's Attention by Emailing Your Questions to Merrilee.byrnes@parks.ca.gov Participation in Disabled Veteran Business Enterprise Program (DVBE): The minimum DVBE participation percentage goal is 6%. Failure to fulfill the DVBE requirement will render your bid non-responsive. DVBE Incentive: For evaluation purposes only, an incentive will be given to bidders who exceed the 6% DVBE participation requirements. Refer to the DVBE forms beginning with DPR 479IP. Small Business Preference and Small Business Subcontractor Participation: A five percent (5%) Small Business Preference will be granted to properly certified small businesses (a completed STD 811 Form must be submitted with the bid proposal). License required: A Engineer's Estimate: $700,000 to $1,000,000 Contract Term: 455 Calendar Days from Notice to Proceed Work Performance Period: 90 Calendar Days from Formal Start Work Date *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$932,400.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2025
September 18, 2025
2 Venice Blvd, Half Moon Bay, CA
Related To This Project
Half Moon Bay, CA
Bid Date: Aug 28 2025
Half Moon Bay, CA
--
Half Moon Bay, CA
Bid Date: Oct 01 2025
Half Moon Bay, CA
--
Half Moon Bay, CA
--
Half Moon Bay, CA
Bid Date: Dec 23 2025
Half Moon Bay, CA
Bid Date: Jan 23 2026
Half Moon Bay, CA
Bid Date: Feb 02 2026
Half Moon Bay, CA
Bid Date: Jun 05 2025
Half Moon Bay, CA
Bid Date: Jun 10 2025
Half Moon Bay, CA
--
Half Moon Bay, CA
Bid Date: Jun 04 2025
Half Moon Bay, CA
Bid Date: Apr 18 2025
Half Moon Bay, CA
Bid Date: Apr 24 2025
Half Moon Bay, CA
Bid Date: Apr 15 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
