BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 31, 2025 at 7:00 PM

Updated January 24, 2026

Site work for a mixed-use development in Half Moon Bay, California. Completed plans call for site work for a sidewalk / parking lot; and bridge / tunnel.

The City of Half Moon Bay is seeking Design Professionals with Caltrans experience for the completion of the Design and Permitting of the Eastside Parallel Trail, Segment 2. The project aims to fill a critical gap in the Eastside Parallel Trail through Half Moon Bay, providing connectivity along California Highway 1 between the existing Naomi Patridge Trail at Ruisseau Francais Avenue and the future Highway 1 North Trail at Spindrift Way. Proposed improvements include a new 12 ft class 1 bicycle/pedestrian trail between Russeau Francais Ave and Spindrift Way, a new bicycle/pedestrian bridge over Frenchmans Creek spanning approximately 200 linear feet, intersection improvements at Russeau Francais Avenue to enhance crosswalks and improve grading and drainage, repair or replacement of a failed wood lagging retaining wall, and new bicycle/pedestrian crossing treatments (striping and signage) at several intersections. Instructions to bidders include submission of questions by 4:00pm on Friday, January 9th, 2026, and proposal submissions in electronic (PDF) format by 4:00pm on Friday, January 23rd, 2026. Question Deadline 01/09/2026 at 4:00 PM PT All questions, technical or otherwise, pertaining to this RFP must be submitted via email to: Dale Leda, PE Interim City Engineer City of Half Moon Bay Email: dleda@halfmoonbay.gov

Post-Bid

Sidewalks / Parking Lot

$2,000,000.00

Public - City

Site Work

3

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
449
Active Projects
226
Bidding Soon
2,531
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2026

March 9, 2026

Project location map

Ruisseau Francais Ave, Half Moon Bay, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.