Published August 20, 2025 at 8:00 PM

Updated August 27, 2025

Site work for a mixed-use development in North Parkersburg, West Virginia. Completed plans call for site work for a educational facility; and pre-engineered storage facility.

Scope of work under Base Bid consists of receiving, unloading and assembly (construction) of a preengineered steel structure purchased by WVUP and required site and foundation work. The Owner will suffer financial loss if the Work is not Substantially Complete within the Contract Time. For each calendar day of delay in achieving Substantial Completion, the Contractor shall be liable for and shall pay the Owner, not as a penalty but as liquidated damages, in accordance with the following schedule: For each calendar day the project is not Substantially Complete, damages to be assessed at $ 500 per day Each Bid shall be accompanied by a certified check payable to the Owner for five percent (5%) of the total Bid, or in lieu of a certified check, a Bid Bond may be provided on the State of West Virginia form included in the Project Manual for five percent (5%) of the total Bid. The attorney-in-fact who executes the bond on behalf of the surety shall affix to the bond a certified and current copy of power of attorney Unless of the Contractotherwise Sum. indicated below, the Penal Sum of the Payment and Performance Bonds shall be the dollar (If Payment amount or or Performance percentage Bonds are to be in an amount other than 100% of the Contract Sum, indicate the of the Contract Sum.) For each calendar day of delay in achieving Final Completion, the Contractor shall be liable for and shall pay half the amount of liquidated damages stated above, plus any additional fees of the Architect and the Architect's consultants that may accrue. Allowances may be made for delays due to shortages of materials and/or energy resources, subject to proof by documentation, and for delays due to strikes or other delays beyond the control of the Contractor. The Contractor in accordance with the Contract Documents must properly document all delays and any claim for extension of the ContractTime. Electronically transmitted Bids and late Bids will not be accepted. Owner reserves the right to accept or reject any/all Bids.

Post-Bid

Educational

$120,000.00

Public - State/Provincial

Site Work

25

15

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
70
Bidding Soon
1,144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

September 25, 2025

Project location map

300 Campus Dr, North Parkersburg, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.