Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2025 at 8:00 PM
Updated October 14, 2025
This is a service / maintenance or supply contract in Driggs, Idaho. Contact the soliciting agency for additional information.
Teton County School District 401 ("District") is soliciting proposals from qualified contractors for radon mitigation services at three school facilities: Driggs Elementary School (DES), Teton Middle School (TMS), and Rendezvous Upper Elementary School (RUES). The District has completed recent radon testing and seeks to move forward with mitigation during Summer 2026, with work to commence as early as June 8th, 2026 and to be completed no later than August 21, 2026. The District values and appreciates the proposals received in the first round.This second RFP is intended to give all qualified contractors a renewed opportunity to participate under clearer expectations and a more practical schedule. The updated timeline now allows work to occur between June 8 and August 21, 2026, during standard working hours. II. Scope of Work by Facility A. Driggs Elementary School (DES) Entire building is to be mitigated (test results are attached as Exhibit A). The facility is a clear-span structure, al allowing relatively straightforward system installation. One provider recommended approximately 9-11 systems, but the actual number may vary by contractor based on system design and efficiency. B. Teton Middle School (TMS) Mitigation is limited to areas testing >= 4.0 pCi/L. Based on the most recent testing (see Exhibit B), 27 rooms require mitigation (down from 33 in prior testing). Contractors should propose designs that address multiple rooms with minimal systems where feasible. C. Rendezvous Upper Elementary School (RUES) Mitigation is limited to areas testing >= 4.0 pCi/L. Based on the most recent testing (see Exhibit C), 17 rooms require mitigation, primarily in the newest addition. This represents a slight increase from prior testing. Contractors should propose designs that address multiple rooms with minimal systems where feasible. Contractors must be licensed to perform radon mitigation in the State of Idaho
Post-Bid
Educational
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 13, 2025
June 8, 2026
Multiple Locations, Driggs, ID
Related To This Project
Driggs, ID
--
Driggs, ID
--
Driggs, ID
--
Driggs, ID
Bid Date: Nov 25 2025
Driggs, ID
Bid Date: Nov 25 2025
Driggs, ID
Bid Date: Dec 08 2025
Driggs, ID
Bid Date: Jul 11 2025
Driggs, ID
--
Driggs, ID
Bid Date: Jun 30 2025
Driggs, ID
Bid Date: Jul 14 2025
Driggs, ID
Bid Date: May 23 2025
Driggs, ID
--
Driggs, ID
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
