BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2025 at 8:00 PM

Updated September 19, 2025

Site work and paving for a sidewalk / parking lot in Shelby, North Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Shelby is accepting bids on project that removed existing sidewalk and installs ADA complaint ramps. There will be 13 ADA ramp installation/replacements Listed below are the contractor's responsibilities for the project. Demo existing sidewalk and curb and gutter at 13 ADA Ramp Replacement locations Replacement 13 ADA Ramps with Black ADA Mats Contractor will be responsible for cleaning up and disposing of all existing conditions and construction materials from the project site upon completion of the project. Contractor shall saw cut the asphalt square and coordinate with the City of Shelby to make the asphalt repair. All ramp installations shall replace curb and gutter that transitions to meet ADA standards. Contractor shall coordinate project with City of Shelby Engineering Department. Contractor shall follow ADA regulations, City of Shelby Standard Details, and NCDOT Standard Roadway Drawings. The surrounding work area shall be graded flush with the edge of the ramp and stabilized with seed and straw. Traffic and pedestrian control will be the responsibility of the contractor. A utility locate must be called in prior to work commencing. All work completed as part of this project will carry a one (1) year warranty beginning at the completion of the project. The bid award for this project will be based on the Total Project Bid. This list is intended to provide the basic scope of work contractor shall field verify quantities prior to bid; any incidental work that is related to this project will be the sole responsibility of the Contractor. Please call Justin Wright at 704-669-2062 if you have any questions during the bidding or construction process. Work shall commence within 14 calendar days of written Notice to Proceed and shall be completed within 45 calendar days thereafter. Liquidated damages in the amount of $250 per day will be enforced for work not completed by the applicable deadline. The City reserves the right to accept or reject any and/or all bids. A valid contractor' s license must be provided (if required based on bid amount. A Certificate of Insurance will be required from the low bidder prior to beginning construction. Contractor's Responsibilities o Demo existing sidewalk and curb and gutter at 13 ADA Ramp Replacement locations o Replacement 13 ADA Ramps with Black ADA Mats o Contractor will be responsible for cleaning up and disposing of all existing conditions and construction materials from the project site upon completion of the project. o Contractor shall saw cut the asphalt square and coordinate with the City of Shelby to make the asphalt repair. o All ramp installations shall replace curb and gutter that transitions to meet ADA standards. o Contractor shall coordinate project with City of Shelby Engineering Department. o Contractor shall follow ADA regulations, City of Shelby Standard Details, and NCDOT Standard Roadway Drawings. o The surrounding work area shall be graded flush with the edge of the ramp and stabilized with seed and straw. o Traffic and pedestrian control will be the responsibility of the contractor. o A utility locate must be called in prior to work commencing. 4" Thick Sidewalk (Standard Detail 2.05) 6" Thick Sidewalk (Standard Detail 2.05) 2' 0" Standard Curb and Gutter (Standard Detail 2.02) Vertical Curb (Standard Detail 2.01) 2' 6" Standard Curb and Gutter ADA Ramp Replacement Please call Justin Wright at 704-669-2062 if you have any questions during the bidding or construction process.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
149
Bidding Soon
1,789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

October 20, 2025

Project location map

E Sumter St, Shelby, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.