BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

Renovation of a playground / park / athletic field in Monroe, Michigan. Completed plans call for the renovation of a playground / park / athletic field.

DESCRIPTION OF WORK: Work items in the Base Bid include, but are not necessarily limited to general conditions, mobilization and demobilization, and the following specific items on as indicated on the Drawings: 1. Excavate 3' wide trench on both sides of CMU wall. 2. Remove and replace (5) CMU courses in 10' sections on the west and north elevations. 3. Install new anchor bolts Install new #4 dowel bars. 4. Install grout material at CMU cores around new anchor bolts. 5. Back fill excavated areas adjacent to CMU wall. 6. Overlay existing asphalt pavement to accomplish 6% slope. 7. Install a gutter along the west elevation. 8. Install two downspouts at the north and south corners of the building. 9. Install CMU siding over the top course of CMU. 10. Install waterproofing at the installed CMU courses below pavement level 11. Sawcut and demo existing slab-on-grade on the west and north elevations. 12. Install new slab-on-grade to match existing on the west and north elevations. 13. The work will require the installation of a shoring system to protect the building and facilitate the work. Please NOTE: o All bid responses require proof of State Project Registration from the Department of Labor and Economic Opportunity. o Bid responses and bid attachments MUST be uploaded to SIGMA VSS. o Contractors should only submit a maximum of two (2) attachments (both being less than 25 MB) for bid responses. One attachment is to be bid documents (Bid Summary, Bid Schedule, Bid Bond, Certification forms, Signature Authority, etc.) and if applicable, the other attachment should be Qualified Disabled Veteran (QDV) information (DD214, Proof of 51% Ownership and Proof of Service-Connected Disability) o Do not wait until just before the solicitation deadline to submit your bid response. SIGMA VSS will not allow a proposal to be submitted after deadline, even if a portion of the bid response has been uploaded. o If you experience issues or have questions regarding your electronic submission, you must contact the SIGMA Help Desk for assistance prior to the solicitation deadline. You may contact the SIGMA Help Desk by telephone at 517.284.0540 or toll-free at 888.734.9749. You may also email the SIGMA Help Desk at sigma-procurement-helpdesk@michigan.gov o Please email the Design and Construction Contract Specialists if you are having SIGMA VSS issues. Please include your SIGMA ticket number and any supporting documentation (i.e., screenshots) to Anne Watros (WatrosA@michigan.gov) and Don Klein (KleinD4@michigan.gov). o You may be asked by our contract specialists to email your bid response. Emailed submissions will require DCD approval and will be handled on a case-by-case basis. o Approved emailed submissions MUST be received prior to 2:00 p.m. deadline to be considered responsive and responsible. o Bid Responses should not be emailed to the Project Director. Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Abdul Rafay Mohammed at amohammed@nthconsultants.com no later than 2:00 p.m., Eastern on 9/23/2025 at 2:00 PM. .

Award

Playgrounds / Parks / Athletic Fields

$155,000.00

Public - State/Provincial

Renovation

12

4

16

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
4
Bidding Soon
1,843
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

December 1, 2025

Project location map

2800 State Park Road, Monroe, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.