Published October 3, 2025 at 8:00 PM

Updated October 9, 2025

Site work and paving for a mixed-use development in Tucson, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The scope of work for project 20112202 consists of an asphalt mill and overlay a portion of Aviator Lane and the reconstruction of Aviator Lane parking lots with installation of new pavement markings. Placement of a new sewer line infrastructure along Aviator Lane. Description of Work: The scope of work for project 20112202 consists of an asphalt mill and overlay a portion of Aviator Lane and the reconstruction of Aviator Lane parking lots with installation of new pavement markings. Placement of a new sewer line infrastructure along Aviator Lane. The scope of work for project 20120331 consists of the reconstruction of Connector Road with a proposed pavement section of 4-inches of asphalt, 4-inches of aggregate base course with stabilized subgrade. Asphalt mill and overlay of parking lot area adjacent to the Ryan Airfield Administration building and restaurant. Install new sewer line infrastructure and new fire access gate to include construction of gate pavements, conduit installation, updated fencing, gate loops, and electronic gate operators. Location of Work: Ryan Airfield 9698 West Ajo Way Tucson, AZ 85735 Substantial Completion: The successful Bidder who contracts with the TAA for the project will be required to achieve Substantial Completion of the entire Work in accordance with the terms of the parties' contract not later than 120 Calendar Days after the issuance of the Notice to Proceed by the TAA. Bid Bond: Each Bid shall be accompanied by a certified check, cashier's check or surety bond ("Bid Bond") for ten per cent (10%) of the amount of the Base Bid and all Bid Alternates included in the Bid as a guarantee that the Bidder will enter into a contract to perform the proposal in accordance with the Drawings and Specifications. Notwithstanding the provisions of any other statute, the Bid Bond shall be executed solely by a surety company or companies holding a certificate of authority to transact surety business in Arizona issued by the Director of the Arizona Department of Insurance pursuant to Title 20, Chapter 2, Article 1 of the Arizona Revised Statutes. The Bid Bond shall not be executed by an individual surety or sureties, even if the requirements of Section 7-101 are satisfied. The certified check, cashier's check or Bid Bond shall be returned to the Bidders whose proposals are not accepted, and to the successful Bidder upon the execution of a satisfactory bond and contract as provided in Title 34 of the Arizona Revised Statutes. The conditions and provisions of the Bid Bond regarding the surety's obligations shall follow the following form: "Now, therefore, if the obligee accepts the proposal of the principal and the principal enters into a contract with the obligee in accordance with the terms of the proposal and gives the bonds and certificates of insurance as specified in the standard specifications with good and sufficient surety for the faithful performance of the contract and for the prompt payment of labor and materials furnished in the prosecution of the contract, or in the event of the failure of the principal to enter into the contract and give the bonds and certificates of insurance, if the principal pays to the obligee the difference not to exceed the penalty of the bond between the amount specified in the proposal and such larger amount for which the obligee may in good faith contract with another party to perform the work covered by the proposal then this obligation is void. Otherwise, it remains in full force and effect provided, however, that this bond is executed pursuant to the provisions of Section 34-201, Arizona Revised Statutes, and all liabilities on this bond shall be determined in accordance with the provisions of the section to the extent as if it were copied at length herein." 9.Costs of Responding to the Invitation to Bid: Any and all costs associated with responding to this Invitation to Bid or in providing a Bid shall be borne by solely by the interested person or firm. 10. TAA's Right to Reject for Any Reason: TAA reserves the right to reject any or all bids or proposals or to withhold the award for any reason which TAA determines. 11.Interest List: TAA is compiling an interest list consisting of all contractors, subcontractors, and major suppliers who are interested in receiving notification of airport projects. The listing of a firm on the TAA Interest List is not an endorsement of that firm and does not indicate that the firm has been pre-qualified for airport work. Please fill out the interest list form for yourself, subcontractor or major supplier and submit with your bid. 12.DBE: It is the policy of the Department of Transportation ("DOT") and TAA that Disadvantaged Business Enterprise firms ("DBEs") as defined in 49 CFR Part 26 (the "DBE Regulations"), shall have a fair and equal opportunity to participate in the performance of contracts financed in whole or in part with federal funds. TAA, in compliance with 49 CFR 26, has adopted a program regarding the participation of DBEs on federally funded projects. Specifically, it is the goal of TAA to ensure that, to the extent reasonably possible and consistent with other legal requirements that: (a) DBEs are not discriminated against in the award and administration of TAA's contracts; (b) a level playing field is created on which DBEs can compete fairly for TAA's contracts; and (c) any barriers to the participation of DBEs in TAA's contracts are removed. A copy of this program is available upon request. TAA has set an aspirational 7% (7% of the dollar value of the contract) DBE participation goal for this contract. As a matter of responsiveness, firms must complete and submit the "Statement of Proposed DBE Utilization" form in the form provided, with its submittal. Firms and firms' subcontractor/subconsultant who are submitting as DBEs must be certified DBEs in Arizona in good standing prior to the date submittals are due. TAA recognizes current DBE certifications by the ADOT, City of Phoenix, and City of Tucson. For information regarding DBE firms recognized by TAA, or if you have any questions about TAA's DBE Program, please contact Bert Resimont, TAA DBE Liaison Officer, at 520-573-8100. 13.Civil Rights Title VI Solicitation Notice. The Tucson Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. 14.Legal Requirements: The Work to be performed will be subject to the provisions of Title 34 of the Arizona Revised Statutes (A.R.S. 34 201, et seq., as amended). All Bidders and their subcontractors must be duly licensed to perform the work at the time the bid is submitted (or exempt from licensing requirements) pursuant to all applicable laws, rules and regulations. If a licensing exemption is claimed, the Bidder must set forth the basis for the claimed exemption in writing at the time the bid is submitted. In addition, the proposed project will be paid in part with monies to be received from the Federal Aviation Administration and the Arizona Department of Transportation. For grant-funded projects, additional legal requirements may be required as set forth in the Bid Documents and proposed contract documents. 15.Contractor Qualification Statement: Bidders shall be required to submit a properly completed and certified "Contractor's Qualification Statement" in the form provided in the Bid Documents. ADOT Grant: E3S3S 01C, E3S3Q 01C No representative, agent of consultant of a Bidder may contact any member of the staff of TAA or the Design Professional, any member or director of TAA or any other agent or consultant of TAA, either directly or indirectly, except as follows: (1) questions related to the bid process or the project may be directed in writing to Jim Wright via email at jim.wright@stantec.com; 2) questions may be raised at any pre-bid meeting to which all potential Bidders are invited. Any communication, or attempted communication, with any person other than those designated above shall, in the sole discretion of TAA, be grounds for disqualification of the Bidder

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

46

15

4

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
15
Bidding Soon
541
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

November 7, 2025

Project location map

Multiple Locations, Tucson, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.