Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 16, 2025 at 8:00 PM
Updated October 17, 2025
Demolition, site work, renovation and addition to a mixed-use development in Danville, Indiana. Completed plans call for the renovation of a 6,200-square-foot educational facility; for the addition of a 4,550-square-foot educational facility; for the demolition of a educational facility; and for site work for a educational facility.
Administration Building Addition and Renovations Project Wood framed addition to and renovation of an existing school administration building including associated site work. Location- 200 Warrior Way, Danville, IN 46122 Construction starts: October 27, 2025 Substantial Completion: February 15, 2027 Final Completion: March 1, 2027 Estimated Cost: $3.8M ALTERNATE #1a: State the amount to be added to the Base Bid to: fully renovate and construct A113 Office, A114 Toilet and A115 Toilet. The work shall include all scope as identified on the Drawings, including work in A102 Passageway as indicated. ALTERNATE #1b: State the amount to be added to the Base Bid to: renovate the remaining interior portion of the existing building including all work as identified on the Drawings. Refer to the Drawings for Base Bid work that is inside the existing building and not part of this add alternate. ALTERNATE #2: State the amount to be added to the Base Bid to: construct the parking lot including light poles and all work as identified on the Drawings. ALTERNATE #3a: State the amount to be added to the Base Bid to: furnish and install the specified standing seam metal roof system on the new building addition as identified on the Drawings. Asphalt shingles are base bid. ALTERNATE #3b: State the amount to be added to the Base Bid to: remove the existing asphalt shingle roof system and furnish and install the specified standing seam metal roof system on the existing building as identified on the Drawings. This alternate shall include all edge metal and trims including drips, fascia, soffit, gutters and downspouts on the existing building. Base bid is no work on the exiting roof other than the tie-in work identified on the Drawings. ALTERNATE #3c: State the amount to be added to the Base Bid to: remove the existing asphalt shingle roof system and replace it with a new asphalt shingle roof system on the existing building as identified on the Drawings. This alternate shall include all edge metal and trims including drips, fascia, soffit, gutters and downspouts on the existing building. Base bid is no work on the exiting roof other than the tie-in work identified on the Drawings. ALTERNATE #5: State the amount to be added to the Base Bid to: remove the existing aluminum siding on the existing building and replace it with new cement board siding as identified on the Drawings and as specified. This includes new building paper, flashings, trims and all work to complete the siding replacement. ALTERNATE #6: State the amount to be added to the Base Bid to: remove and replace the existing furnace, condenser and all other work as identified on the Drawings and as specified for Mechanical Room A120. ALTERNATE #7: State the amount to be added to the Base Bid to: construct the monument sign at the flagpole plaza including all work as identified on the Drawings. Base bid is the flagpole and site flat concrete work only.
Award
Educational
$3,350,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 7, 2025
October 27, 2025
200 Warrior Wy, Danville, IN
Related To This Project
Danville, IN
Bid Date: Sep 26 2025
Danville, IN
Bid Date: Sep 23 2020
Danville, IN
Bid Date: Nov 12 2025
Danville, IN
Bid Date: Dec 18 2025
Danville, IN
Bid Date: Dec 09 2025
Danville, IN
Bid Date: Dec 09 2025
Danville, IN
--
Danville, IN
Bid Date: Aug 06 2025
Danville, IN
Bid Date: Jun 24 2025
Danville, IN
Bid Date: Apr 29 2025
Danville, IN
Bid Date: Mar 25 2025
Danville, IN
Bid Date: Apr 08 2025
Danville, IN
Bid Date: Apr 01 2025
Danville, IN
Bid Date: Feb 25 2025
Danville, IN
Bid Date: Apr 11 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
