BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated November 12, 2025

Site work and paving for a mixed-use development in West Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work will include the furnishing of all labor, materials, equipment, tools, supplies, services, etc., required for the complete installation of the W. Burnham Street Improvements Project. The work generally consists of the following: Restoration - 1 LS, Traffic Control - 1 LS, Erosion and Dust Control - 1 LS, Sanitary Manhole Adjustment - 4 EA, Manhole Adjustment - 5 EA, Storm Inlet Adjustment - 12 EA, Pavement Sawing - 1,250 LF, Concrete Walk Removal - 895 SF, Driveway Pavement Removal - 375 SF, Concrete Curb & Gutter Removal - 494 LF, Pavement Removal/Excavation/Grading - 663 CY, Dense Graded Base (3/4") - 76 TON, Dense Graded Base (1-1/4") - 569 TON, Crushed Limestone Chips (3/4") - 41 TON, 31" Concrete Curb & Gutter - 494 LF, 5" Concrete Sidewalk - 895 SF, 7" Concrete Driveway - 14 SY, 7" Concrete Pavement - 123 SY, 8" Concrete Pavement - 8 SY, 9" Concrete Pavement - 365 SY, Detectable Warning Field, Yellow - 30 SF, Pavement Marking, Epoxy, White, 6-inch - 187 LF, Pavement Marking, Epoxy, Yellow, 4-inch - 389 LF, Pavement Marking, Epoxy, White, 8-inch - 256 LF, Pavement Marking, Stop Line, Epoxy, 18-inch - 41 LF, Pavement Marking, Word, Epoxy - 3 EA, Pavement Marking, Arrows, Type 1, Epoxy - 2 EA, Pavement Marking, Arrows, Type 2, Epoxy - 4 EA, 6" PVC Perforated Underdrain - 134 LF, Valve Adjustment - 4 EA . Bids shall be accompanied by Bid Security in the form of a bid Bond, certified check, or cashier's check made payable to the Village of West Milwaukee in an amount of 5 percent (5%) of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 10 days after the Award, the Check or Bid Bond shall be forfeited to the Village as liquidated damages. Bids shall be submitted on the bid form provided and all blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. The Village reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids and the right to accept the Bid and Bids which best serve the interests of the Village.

Bid Results

Roads / Highways

$352,410.00

Public - City

Paving, Site Work

21

12

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
527
Active Projects
294
Bidding Soon
2,506
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2025

October 24, 2025

Project location map

W Burnham St, West Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.