BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2026 at 8:00 PM

Updated June 13, 2026

Demolition, site work, paving and new construction of a civil project in Brookville, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This Project is a Combo Project That Will Replace the Existing Glen-gery Structure a Single Span Concrete Slab Bridge Carrying Pa 28 Over a Tributary to Redbank Creek in Summerville Borough With a Precast Reinforced Concrete Box Culvert From Approximately 500 Feet From the Start of the Existing Structure at Segment 0030 Offset 1163 to Approximately 500 Feet From the End of the Existing Structure at Segment 0050 Offset 0071. And the Existing Runaway Arch Structure a Reinforced Concrete Arch Carrying Pa 28 Over Runaway Run in Summerville Borough With a Precast Reinforced Concrete Box Culvert From Approximately 500 Feet From the Start of the Existing Structure at Segment 0030 Offset 0312 to Approximately 500 Feet From the End of the Existing Structure at Segment 0030 Offset 1163 and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 28, Section 555, in Jefferson County Summerville Borough. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 42.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Box Culverts Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - Glen-Gery Group Bridges *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Bridges / Tunnels

$5,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
88
Bidding Soon
1,768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2026

August 31, 2026

Project location map

PA-28, Brookville, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.