Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 12, 2026 at 8:00 PM
Updated June 13, 2026
Demolition, site work, paving and new construction of a civil project in Brookville, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This Project is a Combo Project That Will Replace the Existing Glen-gery Structure a Single Span Concrete Slab Bridge Carrying Pa 28 Over a Tributary to Redbank Creek in Summerville Borough With a Precast Reinforced Concrete Box Culvert From Approximately 500 Feet From the Start of the Existing Structure at Segment 0030 Offset 1163 to Approximately 500 Feet From the End of the Existing Structure at Segment 0050 Offset 0071. And the Existing Runaway Arch Structure a Reinforced Concrete Arch Carrying Pa 28 Over Runaway Run in Summerville Borough With a Precast Reinforced Concrete Box Culvert From Approximately 500 Feet From the Start of the Existing Structure at Segment 0030 Offset 0312 to Approximately 500 Feet From the End of the Existing Structure at Segment 0030 Offset 1163 and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 28, Section 555, in Jefferson County Summerville Borough. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 42.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Box Culverts Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - Glen-Gery Group Bridges *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Bridges / Tunnels
$5,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2026
August 31, 2026
PA-28, Brookville, PA
Related To This Project
Brookville, PA
Bid Date: Mar 11 2026
Brookville, PA
Bid Date: Mar 24 2026
Brookville, PA
Bid Date: Apr 07 2026
Brookville, PA
Bid Date: Apr 20 2026
Brookville, PA
Bid Date: May 13 2026
Brookville, PA
Bid Date: May 27 2026
Brookville, PA
Bid Date: May 12 2026
Brookville, PA
Bid Date: Apr 27 2026
Brookville, PA
--
Brookville, PA
Bid Date: Nov 04 2025
Brookville, PA
Bid Date: Aug 05 2025
Brookville, PA
Bid Date: Jul 07 2025
Brookville, PA
Bid Date: Jun 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
