BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 19, 2025

Renovation of an educational facility in Fridley, Minnesota. Completed plans call for the renovation of a 164,445-square-foot educational facility.

All bids shall be opened in the presence of the inBYLT, LLC or the designated representative of Fridley School District for the furnishing of all labor and materials and all else necessary for the following work at the Fridley Middle School: 1) Window Replacement 2) Locker Room Remodel 3) Pool Work 4) Restroom Remodel Project Includes Renovation of pool & locker rooms, replacement of windows and renovation of restrooms. PROJECT DESCRIPTION A. Project Includes Renovation of pool & locker rooms, replacement of windows and renovation of restrooms. Contractor to provide secure access around the construction areas where applicable to prevent students and staff from getting into the work area. This area to be lockable since building will be occupied during this time. 1.03 GENERAL REQUIREMENTS OF CONTRACTS A. Extent of Contract: Unless the Agreement contains a more specific description of the Work of each Contract, requirements indicated on Drawings and in Specification Sections determine which contract includes a specific element of Project. 1. Unless otherwise indicated, the work described in this Section for each contract shall be complete systems and assemblies, including products, components, accessories, and installation required by the Contract Documents. 2. Main building permit is the responsibility of the General Contract. Each trade is responsible for permit requirements for their own work. 3. Trenches and other excavations shall be provided under each contract for its own work. Each contract will be responsible for their own trenches and excavation. 4. Blocking, backing, panels, sleeves, and metal fabrication supports for the work of each contract shall be the work of each bid package for its own work. 5. Furnishing of access panels for the work of each contract shall be the work of each contract for its own work. 6. Equipment pads for the work of each contract shall be the work of each contract for its own work. 7. Roof-mounted equipment curbs for the work of each contract shall be the work of each contract for its own work. 8. Painting for the work of each contract shall be the work of the General Contract. 9. Cutting, Coring and Patching: Each contract shall perform its own cutting and core drilling; patching shall be under the General Contract. 10. Through penetration firestopping for the work of each contract shall be provided by each contract for its own work. Direct questions Submit Bidders Requests for Interpretation using email to NickM@inbylt.com . Question Deadline 10/23/2025

Post-Bid

Educational

$300,000.00

Public - City

Renovation

89

24

44

4

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
157
Bidding Soon
1,536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

March 6, 2026

Project location map

6100 W Moore Lake Dr NE, Fridley, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.