Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 6, 2025 at 7:00 PM
Updated November 19, 2025
Renovation of an educational facility in Fridley, Minnesota. Completed plans call for the renovation of a 164,445-square-foot educational facility.
All bids shall be opened in the presence of the inBYLT, LLC or the designated representative of Fridley School District for the furnishing of all labor and materials and all else necessary for the following work at the Fridley Middle School: 1) Window Replacement 2) Locker Room Remodel 3) Pool Work 4) Restroom Remodel Project Includes Renovation of pool & locker rooms, replacement of windows and renovation of restrooms. PROJECT DESCRIPTION A. Project Includes Renovation of pool & locker rooms, replacement of windows and renovation of restrooms. Contractor to provide secure access around the construction areas where applicable to prevent students and staff from getting into the work area. This area to be lockable since building will be occupied during this time. 1.03 GENERAL REQUIREMENTS OF CONTRACTS A. Extent of Contract: Unless the Agreement contains a more specific description of the Work of each Contract, requirements indicated on Drawings and in Specification Sections determine which contract includes a specific element of Project. 1. Unless otherwise indicated, the work described in this Section for each contract shall be complete systems and assemblies, including products, components, accessories, and installation required by the Contract Documents. 2. Main building permit is the responsibility of the General Contract. Each trade is responsible for permit requirements for their own work. 3. Trenches and other excavations shall be provided under each contract for its own work. Each contract will be responsible for their own trenches and excavation. 4. Blocking, backing, panels, sleeves, and metal fabrication supports for the work of each contract shall be the work of each bid package for its own work. 5. Furnishing of access panels for the work of each contract shall be the work of each contract for its own work. 6. Equipment pads for the work of each contract shall be the work of each contract for its own work. 7. Roof-mounted equipment curbs for the work of each contract shall be the work of each contract for its own work. 8. Painting for the work of each contract shall be the work of the General Contract. 9. Cutting, Coring and Patching: Each contract shall perform its own cutting and core drilling; patching shall be under the General Contract. 10. Through penetration firestopping for the work of each contract shall be provided by each contract for its own work. Direct questions Submit Bidders Requests for Interpretation using email to NickM@inbylt.com . Question Deadline 10/23/2025
Post-Bid
Educational
$300,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2025
March 6, 2026
6100 W Moore Lake Dr NE, Fridley, MN
Related To This Project
Fridley, MN
Bid Date: Jan 06 2026
Fridley, MN
Bid Date: Dec 04 2025
Fridley, MN
Bid Date: Dec 18 2025
Fridley, MN
Bid Date: Dec 18 2025
Fridley, MN
Bid Date: Dec 22 2025
Fridley, MN
Bid Date: Jul 11 2019
Fridley, MN
Bid Date: Jan 20 2026
Fridley, MN
Bid Date: Jan 20 2026
Fridley, MN
Bid Date: Oct 30 2025
Fridley, MN
Bid Date: Aug 21 2025
Fridley, MN
Bid Date: Jul 08 2025
Fridley, MN
Bid Date: Jul 22 2025
Fridley, MN
Bid Date: Jul 08 2025
Fridley, MN
Bid Date: Oct 21 2025
Fridley, MN
Bid Date: Jul 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
