Site work and renovation of a civil project in Springfield, Massachusetts. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The applicable goals for minority and women workforce participation established for this Contract are as follows Women Participation 6.9% Minority Participation 15.3% The work of this project in Springfield, Massachusetts includes, but is not necessarily limited to, replacement of the MassMutual Center Ice Plant, which is approximately 22 years old and is approaching the end of its useful life. The existing system utilizes R-22 refrigerant, which has since been banned from domestic production or foreign import due to the Clean Air Act and has experienced unpredictable price fluctuations along with its very high global warming and ozone depletion impact. A new refrigerant, CO2, has been selected for use to be used by the new packaged chiller skid equipment as part of this new work. Two (2) chiller skid packages with integral equipment, 40% Ethylene glycol pumps, two (2) rooftop mounted evaporative condensers, condenser pumps, condenser holding tank, condenser water treatment, expansion tanks, 40% Ethylene glycol feeder skid, refrigerant monitoring system and associated equipment/accessories serving the ice plant will be demolished, removed, replaced as part of this new work. The existing electrical switchgear in the Mechanical Room will be demolished and upgraded. In addition, a new 100% water,140F Zamboni/Ice melt system will be installed. All as more fully set forth in the Drawings and Notes. Questions Due: 10/24/225 @5:00pm Replacement of the MassMutual Center Ice Plant. A new refrigerant, CO2, will be used by the new packaged chiller skid equipment as part of this new work. Two chiller skid packages with integral equipment, 40% Ethylene glycol pumps, rooftop mounted evaporative condensers, condenser pumps, condenser holding tank, condenser water treatment, expansion tanks, 40% Ethylene glycol feeder skid, refrigerant monitoring system and associated equipment/accessories serving the ice plant will be demolished, removed, replaced as part of this new work. The existing electrical switchgear in the Mechanical Room will be demolished and upgraded. In addition, a new 100% water, 140F Zamboni/Ice melt system will be installed. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Sub Bid Category Electrical

Bid Results

Water / Sewer

$242,617.00

Public - State/Provincial

Renovation, Site Work

25

27

20

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
5
Bidding Soon
2,800
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

December 19, 2025

Project location map

1277 Main St, Springfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.