Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 10, 2025 at 7:00 PM
Updated November 11, 2025
Site work and renovation of a civil project in Springfield, Massachusetts. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The applicable goals for minority and women workforce participation established for this Contract are as follows Women Participation 6.9% Minority Participation 15.3% The work of this project in Springfield, Massachusetts includes, but is not necessarily limited to, replacement of the MassMutual Center Ice Plant, which is approximately 22 years old and is approaching the end of its useful life. The existing system utilizes R-22 refrigerant, which has since been banned from domestic production or foreign import due to the Clean Air Act and has experienced unpredictable price fluctuations along with its very high global warming and ozone depletion impact. A new refrigerant, CO2, has been selected for use to be used by the new packaged chiller skid equipment as part of this new work. Two (2) chiller skid packages with integral equipment, 40% Ethylene glycol pumps, two (2) rooftop mounted evaporative condensers, condenser pumps, condenser holding tank, condenser water treatment, expansion tanks, 40% Ethylene glycol feeder skid, refrigerant monitoring system and associated equipment/accessories serving the ice plant will be demolished, removed, replaced as part of this new work. The existing electrical switchgear in the Mechanical Room will be demolished and upgraded. In addition, a new 100% water,140F Zamboni/Ice melt system will be installed. All as more fully set forth in the Drawings and Notes. Questions Due: 10/24/225 @5:00pm Replacement of the MassMutual Center Ice Plant. A new refrigerant, CO2, will be used by the new packaged chiller skid equipment as part of this new work. Two chiller skid packages with integral equipment, 40% Ethylene glycol pumps, rooftop mounted evaporative condensers, condenser pumps, condenser holding tank, condenser water treatment, expansion tanks, 40% Ethylene glycol feeder skid, refrigerant monitoring system and associated equipment/accessories serving the ice plant will be demolished, removed, replaced as part of this new work. The existing electrical switchgear in the Mechanical Room will be demolished and upgraded. In addition, a new 100% water, 140F Zamboni/Ice melt system will be installed. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Sub Bid Category Electrical
Bid Results
Water / Sewer
$242,617.00
Public - State/Provincial
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2025
December 19, 2025
1277 Main St, Springfield, MA
Related To This Project
Springfield, MA
--
Springfield, MA
Bid Date: Jan 14 2026
Springfield, MA
--
Springfield, MA
Bid Date: Apr 25 2025
Springfield, MA
--
Springfield, MA
Bid Date: Nov 18 2025
Springfield, MA
Bid Date: Nov 12 2025
Springfield, MA
Bid Date: Nov 25 2025
Springfield, MA
Bid Date: Nov 13 2025
Springfield, MA
Bid Date: Nov 10 2025
Springfield, MA
--
Springfield, MA
Bid Date: Oct 22 2025
Springfield, MA
Bid Date: Oct 15 2025
Springfield, MA
Bid Date: Dec 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
