Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 27, 2025 at 8:00 PM
Updated October 30, 2025
Site work and paving for a sidewalk / parking lot in Port Townsend, Washington. Completed plans call for site work for a one-story above grade sidewalk / parking lot; and one-story above grade sidewalk / parking lot.
As of October 27, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. The City of Port Townsend is soliciting proposals from civil engineering consulting firms to provide design- and construction-phase services for two multimodal improvements projects. The required project work includes: surveying, engineering design, permitting support, right-of-way acquisition support if needed, preparation of plans, specifications, estimates, and contract documents (PS&E), bidding support, engineering support during construction, and potentially, construction management. Proposals should address the following projects: 1. 19th Street Active Transportation Safety Improvements: Construction of approximately 1,300 feet of sidewalk on the southern side of 19th Street between Landes Street and San Juan Avenue. Design considerations include sidewalk, curb extensions, rectangular rapid flash beacons (RRFBs), buffered bike lanes, raised crosswalks, median islands, and ADA-compliant curb ramps. 2. SR20 (Bishop Canyon) Bike and Pedestrian Safety Project: Construction of approximately 800 feet of sidewalk on the southern side of SR20 between Logan Street and Hancock Street. Design components include lane width reduction, raised crosswalk, RRFBs, crossing markings, illumination (with free-standing light standards and luminaires mounted to existing poles), curb ramps, buffered bike lane, replacement of gravity sewer main, and sidewalks. Each project will be a stand-alone contract and may be awarded to a single or multiple consultant teams. Work will be authorized after funding approval by Washington State Department of Transportation (WSDOT) Local Programs.
Post-Bid
Sidewalks / Parking Lot
$2,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2025
October 15, 2026
Multiple Locations, Port Townsend, WA
Related To This Project
Port Townsend, WA
Bid Date: Nov 19 2025
Port Townsend, WA
Bid Date: Nov 21 2025
Port Townsend, WA
Bid Date: Dec 22 2025
Port Townsend, WA
Bid Date: Oct 21 2025
Port Townsend, WA
Bid Date: Oct 15 2025
Port Townsend, WA
Bid Date: Oct 08 2025
Port Townsend, WA
--
Port Townsend, WA
--
Port Townsend, WA
Bid Date: Aug 13 2025
Port Townsend, WA
Bid Date: Aug 01 2025
Port Townsend, WA
--
Port Townsend, WA
--
Port Townsend, WA
Bid Date: Jul 24 2025
Port Townsend, WA
Bid Date: Jul 23 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
