Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 20, 2025 at 8:00 PM
Updated November 22, 2025
Renovation of an educational facility in Belmont, North Carolina. Completed plans call for the renovation of a educational facility.
Provide services for the installation of a new process equipment chiller and components in the Fiber Innovation Center Building for the new manufacturing equipment currently being installed in the building. Provide services for the installation of a new process equipment chiller and components in the Fiber Innovation Center Building for the new manufacturing equipment currently being installed in the building. The chilled water system will be comprised of the following: o Provide and Install one, 60 ton, air cooled, scroll chiller. o Provide and Install one, 134 gpm, 5 Hp, end suction chilled water pump. o The chilled water pump will be provided with a variable frequency controller (VFC). VFC will be provided for capacity control, soft start characteristics, and diagnostics. o The new chiller will be located outside of the building at the rear of the building on the existing concrete. The chiller shall be located a minimum of 7 ft from the building near the existing double doors of the Reactor Rm or Extruder Rm. o Chilled water main piping will be distributed throughout the Reactor Room and the Extruder Room utilizing mains, tees, valved branches with both shut-off and balancing valves. Risers and final connections to the various pieces of equipment will be done as part of those individual projects. Refer to piping schematic attached for additional information. o The chilled water system will be provided with a pump, 500 gallon, open storage tank large enough to hold the contents of the entire system for maintenance purposes and all strainers, control valves, thermometers and temperature sensors, pressure gauges and sensors, self-contained automatic controls system, and appurtenances for a complete and operable system. The State reserves the right to waive any minor informality or technicality in bids received. Contractor shall furnish a Performance Bond and Payment Bond executed by a surety company authorized to do business in North Carolina. Question Deadline 11/14/2025 Should the bidder find discrepancies in, or omission from, the drawings or documents or should he be in doubt as to their meaning, he shall at once notify the designer who will send written instructions in the form of addenda to all bidders. Notification should be no later than seven (7) days prior to the date set for receipt of bids. Neither the owner nor the designer will be responsible for any oral instructions.
Post-Bid
Educational
$500,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2025
December 22, 2025
7224 Wilkinson Blvd, Belmont, NC
Related To This Project
Belmont, NC
--
Belmont, NC
Bid Date: Dec 19 2025
Belmont, NC
Bid Date: Jan 09 2026
Belmont, NC
Bid Date: Oct 10 2025
Belmont, NC
--
Belmont, NC
Bid Date: Sep 18 2025
Belmont, NC
Bid Date: Jul 16 2025
Belmont, NC
Bid Date: Jun 19 2025
Belmont, NC
Bid Date: Jul 24 2025
Belmont, NC
Bid Date: Apr 17 2025
Belmont, NC
Bid Date: Mar 21 2025
Belmont, NC
--
Belmont, NC
Bid Date: Feb 17 2025
Belmont, NC
--
Belmont, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
