Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 22, 2025 at 7:00 PM
Updated December 23, 2025
Site work and paving for a mixed-use development in Indio, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the IWA Engineer. The project is located on Avenue 42 between Country Club Drive and Glass Drive in the City of Indio, CA. The project will consist of installing an 18-in X 12-in tapping tee with a 12" flanged butterfly valve, approximately 56 LF of 12" DIP, a new 8-inch meter vault assembly, a new standard IWA AMI meter box for a transmitter only adjacent to the 8-inch meter vault, and restoration of pavement, curb and gutter, sidewalk, and landscaping. The work will include all required survey, traffic control, restoration of any damaged road markings, and final cleanup License Requirements: Class "A" General Engineering Contractor's License. All electrical work shall be performed by a licensed C-10 Electrical Contractor. Online Q&A Yes Q&A Deadline 11/12/2025 3:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date January 15, 2026 Project Duration 60 Working Days Bid Valid 60 Liquidated Damages 1,000 License Requirements: Class "A" General Engineering Contractor's License. All electrical work shall be performed by a licensed C-10 Electrical Contractor. Question Deadline 11/12/2025 at 3:00 PM PT RFIs must be submitted via Online Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date January 15, 2026 Project Duration 60 Working Days Bid Valid 60 Liquidated Damages 1,000
Award
Roads / Highways
$129,389.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2025
January 16, 2026
Ave 42, Indio, CA
Related To This Project
Indio, CA
Bid Date: Dec 05 2025
Indio, CA
Bid Date: Dec 05 2025
Indio, CA
Bid Date: Jan 06 2026
Indio, CA
Bid Date: Jan 08 2019
Indio, CA
Bid Date: Oct 21 2025
Indio, CA
Bid Date: Oct 06 2021
Indio, CA
Bid Date: Dec 18 2025
Indio, CA
Bid Date: Jul 10 2025
Indio, CA
Bid Date: Jun 06 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
