BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 22, 2025 at 7:00 PM

Updated December 23, 2025

Site work and paving for a mixed-use development in Indio, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the IWA Engineer. The project is located on Avenue 42 between Country Club Drive and Glass Drive in the City of Indio, CA. The project will consist of installing an 18-in X 12-in tapping tee with a 12" flanged butterfly valve, approximately 56 LF of 12" DIP, a new 8-inch meter vault assembly, a new standard IWA AMI meter box for a transmitter only adjacent to the 8-inch meter vault, and restoration of pavement, curb and gutter, sidewalk, and landscaping. The work will include all required survey, traffic control, restoration of any damaged road markings, and final cleanup License Requirements: Class "A" General Engineering Contractor's License. All electrical work shall be performed by a licensed C-10 Electrical Contractor. Online Q&A Yes Q&A Deadline 11/12/2025 3:00 PM (PDT) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date January 15, 2026 Project Duration 60 Working Days Bid Valid 60 Liquidated Damages 1,000 License Requirements: Class "A" General Engineering Contractor's License. All electrical work shall be performed by a licensed C-10 Electrical Contractor. Question Deadline 11/12/2025 at 3:00 PM PT RFIs must be submitted via Online Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date January 15, 2026 Project Duration 60 Working Days Bid Valid 60 Liquidated Damages 1,000

Award

Roads / Highways

$129,389.00

Public - City

Paving, Site Work

7

19

10

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
119
Bidding Soon
1,271
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

January 16, 2026

Project location map

Ave 42, Indio, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.