BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 29, 2025 at 7:00 PM

Updated February 11, 2026

Demolition, site work and new construction of a pre-engineered storage facility in Shelton, Washington. Completed plans call for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Site Directions: HWY 101 North of downtown Shelton. Refer to Vicinity Map on Drawings Construct modifications to existing pre-engineered metal building, to house an ice cream processing facility with staff areas, offices, and sales area. See cover sheet of Drawings for a more detailed listing of modifications. Est. Completion Date: May 31, 2026

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$2,823,322.00

Public - County

Demolition, New Construction, Site Work

84

27

41

6

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
2
Bidding Soon
786
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

December 15, 2025

Project location map

130 W Corporate Rd, Shelton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.